img

Wechat

Adv. Search

Gold Science and Technology ›› 2012, Vol. 20 ›› Issue (6): 76-78.

Previous Articles     Next Articles

Research and Application of  Step-by-step Approach Caving Mining Method

WANG Liqun,SUN Li,ZHAO Zhiqiang,LI Yuan,ZHANG Jingtao   

  1. Jiaojia Gold Mine,Shandong Gold (Laizhou) Co.,Ltd.,Laizhou   261441,Shandong,China
  • Received:2012-05-26 Revised:2012-08-20 Online:2012-12-28 Published:2013-06-21

Abstract:

The mining methods of Jiaojia gold mine can be divided into the upward horizontal slicing-filling mining method and downward horizontal slicing-filling mining method.After drift mining,goaf filling will be adopted.The existing mining method leads to lower mining efficiency,which can not satisfy the demand for the development of production.In order to increase the ore room production capacity,improve the ability of mine,increase the labor efficiency,reduce quasi ratio,and save costs,we begin to research the step-by -step approach caving mining method,based on the original upward horizontal slicing-filling mining methods.After the research and application of the drift mining method,the production capacity of chamber has improved by 86%, which reduce the mining cost and quasi ratio,improve work efficiency obviously.The research and application of this method give mortal contribution to improves production capacity of chamber,reduce cost of production and improve work efficiency,which has significant meaning to the rapid and safe development of mine,establish solid foundation to improve the production capacity of mine area.

Key words: Drift mining, Step-by-step caving, Mining method, Jiaojia gold mine, Shandong Province

CLC Number: 

  • TD853.34

[1] 解世俊.金属矿床地下开采[M].北京:冶金工业出版,2008.
[2] 刘同有.充填采矿技术与应用[M].北京:冶金工业出版,2001.
[3] 张继春.工程控制爆破[M].成都:西南交通大学,2001.
[4] 魏兆云,陈国山.控制爆破技术在采场落矿中的应用[J].黄金,2008,29(10):26-28.
[5] 任建平.会泽铅锌矿采场爆破及临时支护技术应用研究[D].长沙:中南大学,2010.
[6] 陈从新.复杂条件下地下采矿稳定性研究[M].武汉:湖北科学技术出版社,2005.
[7] 王大为,王卓,李磊,等.上向水平扇形进路采矿方法的研究应用[J].黄金科学技术,2012,20(2):67-70.
[8] 郭析兴,李向东.上向进路胶结充填法的工艺改进[J].矿业研究与开发,2000,20(6):3-5.
[9] 丁剑锋,刘丰韬,陈国平,等.化学注浆技术在三山岛金矿的研究与应用[J].黄金科学技术,2012,20 (4):54-57.

[1] CAO Shirong,HAN Jianwen,LI Yongxin,WANG Xiaojun,FENG Xiao,ZHUO Yulong. Damage Analysis of Solid Waste Rock Cemented Filling Body Based on Acoustic Emission Probability Density Function [J]. Gold Science and Technology, 2017, 25(6): 92-98.
[2] LIU Zhixiang,GONG Yongchao,LI Xibing. Study on the Backfilling Material Properties Based on Fractal Theory and BP Neural Network [J]. Gold Science and Technology, 2017, 25(2): 38-44.
[3] YANG Bo,YANG Shijiao,WANG Fulin. Numerical Simulation of Cemented Filling Pipeline Transportation of High-density Whole Tailing Based on ANSYS/FLOTRAN [J]. Gold Science and Technology, 2015, 23(5): 60-65.
[4] WANG Xinmin,HU Yibo,WANG Shi,LIU Jixiang,CHEN Yu,BIAN Jiwei. Orthogonal Test of Optimization of Ultrafine Whole-tailings Backfill Materials [J]. Gold Science and Technology, 2015, 23(3): 45-49.
[5] DAI Xingguo,FANG Xin,CHEN Zengjian,HUANG Yi. Reasonable Selection of Parameters about Full Tailings Cementation Filling of Liangshan Iron Mine [J]. Gold Science and Technology, 2015, 23(1): 74-79.
[6] YU Changxian,HE Shunbin,YANG Shanghuan,HUANG Wei. Practice of Afterwards Back-filling Mining of Sublevel Caving Medium-Deep Hole [J]. Gold Science and Technology, 2014, 22(4): 85-88.
[7] ZHAO Long,WANG Nan,SUN Mingjun. The Optimize Application of Panel Mining Method Second Step in Sanshandao Gold Mine [J]. Gold Science and Technology, 2013, 21(6): 73-77.
[8] DONG Jinkui,SHEN Yan,QIU Jungang. Investigation of Joint Fissure and Analysis of Ore-rock Stability in Sizhuang Mining of Jiaojia Gold Deposit [J]. J4, 2012, 20(2): 58-61.
[9] CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng. Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine [J]. J4, 2012, 20(2): 62-66.
[10] WANG Dawei, WANG Zhuo,LI Lei, LI Weining,QIN Weili,LIU Hongwei, LI Weiguo. Research and Application of the Upward Horizontal Fan Drift Mining Method [J]. J4, 2012, 20(2): 67-70.
[11] LIU Fujiang,WANG Yuankui,WANG Zhenjun,WEI Kailin,WU Zhiming. Discussion on the Enhancement of Blasting Quality for Multi-jointed Fracture Ore-rock [J]. J4, 2012, 20(2): 71-73.
[12] BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69.
[13] TANG Junzhi , WANG Jiangbo , LIN Hongyong. application of artificial concrete-bottom and concrete-lane in the thin vein of gold mine [J]. J4, 2008, 16(3): 45-48.
[14] CHEN Hong-Bing, WANG Yong-Cheng, HU Shi-Li. Stuffing and Dosage Calculation of Using High Concentration to Concrete Tailings [J]. J4, 2007, 15(3): 58-61.
[15] CHEN Hua-Zhen, SUN Chao, SONG Chang-Bao. Some Prorblems of the New Tailing Cemnent Material in the Application [J]. J4, 2006, 14(1): 32-35.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!