img

Wechat

Adv. Search

Gold Science and Technology ›› 2015, Vol. 23 ›› Issue (5): 41-46.doi: 10.11872/j.issn.1005-2518.2015.05.041

Previous Articles     Next Articles

Development of CAD Data Interface in 3D Modeling Visualized Integrated System of Goaf

LUO Zhouquan,QIN Yaguang,ZHOU Jiming   

  1. School of Resources and Safety Engineering,Central South University,Changsha    410083,Hunan,China
  • Received:2015-02-15 Revised:2015-06-30 Online:2015-10-28 Published:2015-12-09

Abstract:

As one of the world’s most widely used drawing platform in engineering and research field currently,AutoCAD software has the significant value in mining field.In order to improve the function and application value of 3D Modeling Visualized Integrated System of Goaf which was developed independently,CAD data interface of the integrated system was developed on the basis of researching the data storage structure of dxf file used universally by CAD and summarizing the data storage rule of different graphic elements.Through the interface,the data in dxf file about goaf’s point cloud model,profile and triangular mesh entity model could be read by integrated system.At the same time,the dxf files about goaf’s point cloud model,profile,and triangular mesh entity model could be generated automatically.CAD Data Interface effective development methods was presented,data storage structures of different graphic dxf file was parsed,store law of different data elements in the dxf file was summarized.The practical application showed that data sharing between the integrated system and AutoCAD was well realized through this interface,so great conveniences could be brought in the work surrounding goaf,like relevant mining design.And this achievement can provide useful reference to research on the CAD interface.

Key words: goaf , 3D modeling, visualized integrated system, CAD data interface, development

CLC Number: 

  • TD325

[1] 罗周全,刘晓明,张木毅,等.大规模采场三维探测及回采指标可视化计算[J].中南大学学报(自然科学版),2009,40(6):1732-1736.
[2] 夏永华,方源敏,孙宏生,等.三维激光探测系统在采空区测量中的误差分析与校正[J].测绘通报,2009,(9):18-21.
[3] Luo Z Q,Liu X M,Zhang B,et al.Cavity 3D modeling and correlative techniques based on cavity monitoring[J].Journal of Central South University of Technology,2008,15(5):639-644.
[4] Lv S R,Lv S J.Research on Governance of Potential Safety Hazard in Da’an Mine Goaf[J].Procedia Engineering,2011,26:351-356.
[5] Liu X M,Luo Z Q,Yang B,et al.Visible calculation of mining index based on stope 3D surveying and  block modeling[J].International Journal of Mining Science and Technology,2012,22(2):139-144.
[6] 白复锌,王善功,安智海.地下矿山开采三维可视化系统在鑫汇金矿的应用[J].黄金科学技术,2011,19(1):55-57.
[7] 罗贞焱.基于CMS探测的采空区三维可视化系统研究[D].长沙:中南大学,2010.
[8] Yamaguchi T,Kawase Y,Nishimura T,et al.2D finite element analysis data creating system with CAD data[J].Journal of Materials Processing Technology,2005,161(1/2):311-314.
[9] 陈永锋.AutoCAD及其在矿业工程中的应用[J].黄金科学技术,2000,8(3):43-46.
[10] 任沂军.AutoCAD中DXF文件的坐标转换分析与实现[J].测绘通报,2006,(7):63-65.
[11] 赵得录.利用VB实现DXF图形文件的平面坐标转换与投影换带[J].测绘通报,2012,(2):52-53,61.
[12] 刘祥凯,唐彦峰,王佳宁,等.装备CAD模型与几何描述模型的接口技术研究[J].兵工学报,2007,28(1):115-118.
[13] deArteaga I,Morer P.The effect of geometry on the structural capacity of masonry arch bridges[J].Construction and Building Materials,2012,34:97-106.
[14] Li  P F,Gao T,Wang J P,et al.Open  architectre of CNC system research based on CAD graph-driven  technolgy[J].Robotics and Computer-Integrated  Manufacturing,2010,26(6):720-724.
[15] Ye J H,Xie M H.Research on the method of realizing automatically programming tool of NC code and optimization ordering based on DXF file[J].Journal of Shanghai University:English Edition,2004,8(S1):172-176.

[1] REN Weicheng,QIAO Dengpan,ZHOU Zhiwei. Research on the Change Law of Volume Fraction of Tailings with Tailings Silo Height in Vertical Tailings Silo [J]. Gold Science and Technology, 2018, 26(1): 64-73.
[2] ZHANG Qinli,WANG Jing,WANG Xinmin. Failure Risk Assessment Model of Filling Pipeline Based on KPCA and PSO-SVM [J]. Gold Science and Technology, 2017, 25(3): 70-76.
[3] DENG Gao,YANG Shan. Stability Evaluation of Goafs Based on Combined Forecasting and Variable Precision Rough Fuzzy Set [J]. Gold Science and Technology, 2017, 25(3): 98-107.
[4] BI Lin,ZHAO Hui,YANG Xinfeng. Study on Principle and Method for Calculation of Earthwork Volume in the DIMINE Software [J]. Gold Science and Technology, 2017, 25(3): 108-115.
[5] MENG Kun,LUO Zhouquan,QIN Yaguang. Study on the Stope Displacement Unstability Process Under Complex Mining Environment [J]. Gold Science and Technology, 2017, 25(2): 70-75.
[6] LONG Keming,WANG Liguan. Optimization of Stope Structural Parameters Based on ANSYS-R Method [J]. Gold Science and Technology, 2015, 23(6): 81-86.
[7] QIU Jungang, ZHANG Zhonghui, YU Bin, WANG Dawei, HOU Dengyou, DENG Qihai. A Case Research on the Solution for Old Workings in Sizhuang Mining Area of Jiaojia Gold Mine [J]. J4, 2009, 17(4): 62-64.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!