img

Wechat

Adv. Search

Gold Science and Technology ›› 2017, Vol. 25 ›› Issue (3): 108-115.doi: 10.11872/j.issn.1005-2518.2017.03.108

Previous Articles     Next Articles

Study on Principle and Method for Calculation of Earthwork Volume in the DIMINE Software

BI Lin1,ZHAO Hui1,YANG Xinfeng2   

  1. 1.School of Resources and Safety Engineering,Central South University,Changsha   410083, Hunan,China;
    2.Changsha Digital Mine Information Technology Co.,Ltd.,Changsha   410083,Hunan,China
  • Received:2016-05-12 Revised:2016-07-20 Online:2017-06-30 Published:2017-09-11

Abstract:

Calculation of earthwork is one of the most important aspects of earth and rock engineering.In order to correctly use the methods to calculate earthwork and improve the accuracy of calculation,the basic principle of four different calculation methods in the DIMINE was studied.Combining with different engineering cases,the calculation results of the four methods were separately compared and analyzed by regarding the corresponding Boolean volume as the standard,and the error of each calculation method and the adaptability to data with different characteristics were discussed.The results show that there is different calculation accuracy for different method owing to the influence of the original data of landform characteristics,terrain change trend and slope variation.According to the basic principle of each calculation method and the error analysis of the experimental results,the corresponding suggestions were put forward aiming at the problems of application of the methods to calculate earthwork under the conditions of data with different characteristics,it provide reference to calculate earthwork with DIMINE correctly.

Key words:  amount of filling and excavation, mine surveying, earthwork volume, 3D modeling, DIMINE sofeware, calculation principle, error analysis

CLC Number: 

  • TD325

[1] Luo Deren,Zou Zili,Tang Jianglong.Contrasting and analysis of the method of earthwork calculation[J].Journal of East China Institute of Technology,2005,28(1):59-64.[罗德仁,邹自力, 汤江龙.工程土方量计算比较分析[J].东华理工大学学报,2005,28(1):59-64.]
[2] Li Yong,Hu Song,Li Lianhai,et al.Comparative study on several measurement methods of earthwork calculations[J]. Beijing Surveying and Mapping,2013(6):68-72.[李勇,胡松, 李连海,等.几种土石方量测量计算方法的对比研究[J].北京测绘,  2013(6):68-72.]
[3] Wang Baocheng,Zhao Feng.Precision analysis of calculating amount of earthwork[J].Bulletin of Surveying and Mapping,2002(11):40-41.[王宝成,赵锋.填挖方量计算的精度评定[J].测绘通报,2002(11):40-41.]
[4] Zhang Xindong.The calculating method discussion on land levelling surveying[J].Beijing Surveying and Mapping,2004(2):42-44.[张新东.土地平整测量计算方法的探讨[J].北京测绘,2004(2):42-44.]
[5] Cao Chunjie,Sun Bin,Ren Xiaopeng,et al.Study on cal- culation of earthwork in complex terrain open-pit mine[J].Coal Engineering,2009(11):87-88.[曹春杰,孙斌,任晓鹏,等.复杂地形露天矿土方量计算方法的研究[J].煤炭工程,2009(11):87-88.]
[6] Zhang Guanghui.The method for rapidly calculating earth- work quantity[J].Bulletin of Surveying and Mapping,1997(5):23-24. [张光辉.快速计算土方量的方法[J].测绘通报,1997(5):23-24.]
[7] Liu Changshun,Du Lijuan.Application of Arcview for cal- culating earthwork in land consolidation project[J].Transactions of the Chinese Society of Agricultural Engi- neering,2003,19(2):224-227.[柳长顺,杜丽娟.Arcview在土地整理项目土方量计算中的运用[J].农业工程学报,2003,19(2):224-227.]
[8]  Chen Yongfeng,Wu Xiaoru,Yuan Yubo.Research of mining engineering volume calculation method based on DTM for surface mine[J].Metal Mine,2010(12):15-17.[陈永锋,吴晓茹,原玉博.基于DTM的露天矿采剥工程量计算方法研究[J].金属矿山,2010(12):15-17.]
[9]  Shen Zhangquan,Mao Yerong,Dong Yunqi,et al.Application of digital elevation model and genetic algorithm in determining design elevation in land consolidation project[J].Transactions of the Chinese Society of Agricultural Engineering,2005,21(5):12-15.[沈掌泉,毛叶嵘,董云奇,等.用数字高程模型和遗传算法确定土地平整设计高程的初步研究[J].农业工程学报,2005,21(5):12-15.]
[10] Dong Ziliang,Wang Liguan,Bi Lin.Stoping design for non- pillar mining based on DIMINE[J].Mining and Metallur- gical Engineering,2011,31(3):26-29.[董子良,王李管,毕林.基于DIMINE的无底柱采矿回采设计[J].矿冶工程,2011,31(3):26-29.]
[11] Jiang Jingming,Wang Liguan.DIMINE mining software pro- mote the development of China’s digital mine[J].China Mining Magazine,2009,18(10):90-92.[蒋京名,王李管.DIMINE矿业软件推动我国数字化矿山发展[J].中国矿业,2009,18(10):90-92.]
[12] Feng Honggang,Wang Liguan,Bi Lin.Three dimensional visualization and its application based on DIMINE[J]. Mineral Engineering Research,2010,25(3):7-10.[冯红刚,王李管,毕林.基于DIMINE软件的三维可视化技术及其工程应用[J].矿业工程研究,2010,25(3):7-10.]
[13] Wang Lilei,Wang Liguan.Using DIMINE software to achieve digitization of China mine[J].Morden Mining,2009,25(3):23-27.[王立磊,王李管.依托DIMINE软件实现中国矿山的数字化[J].现代矿业,2009,25(3):23-27.]
[14] Duan Qiang.Calculation of earthworks and rockwork strip- ping volume of the mine based on DIMINE mining software[J].Mining Engineering,2015,13(5):58-59.[段强.基于 DIMINE 矿业软件的矿山土石方剥离量计算[J].矿业工程,2015,13(5):58-59.]
[15] Wu Qinghai.Calculation of stripping quantity in opencast coal mine using CASS mapping software[J].Mining and Metallurgical Engineering,2008,28(6):22-23.[吴清海.基于CASS绘图软件的露天矿采剥工程量计算[J].矿冶工程,2008,28(6):22-23.]
[16] Guo Fenglun,Wang Benke.Calculation of earthwork by cross section method and precision analysis[C]//Pro- ceedings of the annual conference on surveying and mapping in shandong.Jinan:Shandong Surveying and Mapping Industry Association,2006.[郭丰伦,王本科.断面法计算土石方量及精度分析[C]//山东省测绘学术年会论文集.济南:山东省测绘行业协会,2006.]
[17] Hao Taiping. An Overview of Solid Mineral Exploration[M].Beijing:China University of Geosciences Press,2008.[郝太平.固体矿产探采选概论[M].北京:中国地质大学出版社,2008.]
[18] Wang J Y.The Theory of Spatial Information Syetem[M].Beijing:Science Press,2001.
[19] Miles R E.Probability distribution of a network of triangles (Mary Beth Stearns)[J].Siam Review,1969,11(3):399-402.
[20] Lingas A.The Greedy and Delauney triangulations are not bad in the average case[J].Information Processing Letters,1986,22(1):25-31.
[21] Bi Lin,Wang Liguan,Chen Jianhong,et al.A 3D model of surface mine based on CDT and Boolean operation[J]. Journal of Liaoning Technical University(Natural Science),2009,28(4):529-532.[毕林,王李管,陈建宏,等.基于CDT与布尔运算的露天矿三维建模[J].辽宁工程技术大学学报(自然科学版),2009,28(4):529-532.]

[1] REN Weicheng,QIAO Dengpan,ZHOU Zhiwei. Research on the Change Law of Volume Fraction of Tailings with Tailings Silo Height in Vertical Tailings Silo [J]. Gold Science and Technology, 2018, 26(1): 64-73.
[2] ZHANG Qinli,WANG Jing,WANG Xinmin. Failure Risk Assessment Model of Filling Pipeline Based on KPCA and PSO-SVM [J]. Gold Science and Technology, 2017, 25(3): 70-76.
[3] DENG Gao,YANG Shan. Stability Evaluation of Goafs Based on Combined Forecasting and Variable Precision Rough Fuzzy Set [J]. Gold Science and Technology, 2017, 25(3): 98-107.
[4] MENG Kun,LUO Zhouquan,QIN Yaguang. Study on the Stope Displacement Unstability Process Under Complex Mining Environment [J]. Gold Science and Technology, 2017, 25(2): 70-75.
[5] LONG Keming,WANG Liguan. Optimization of Stope Structural Parameters Based on ANSYS-R Method [J]. Gold Science and Technology, 2015, 23(6): 81-86.
[6] LUO Zhouquan,QIN Yaguang,ZHOU Jiming . Development of CAD Data Interface in 3D Modeling Visualized Integrated System of Goaf [J]. Gold Science and Technology, 2015, 23(5): 41-46.
[7] QIU Jungang, ZHANG Zhonghui, YU Bin, WANG Dawei, HOU Dengyou, DENG Qihai. A Case Research on the Solution for Old Workings in Sizhuang Mining Area of Jiaojia Gold Mine [J]. J4, 2009, 17(4): 62-64.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!