Gold Science and Technology ›› 2018, Vol. 26 ›› Issue (1): 64-73.doi: 10.11872/j.issn.1005-2518.2018.01.064
Previous Articles Next Articles
REN Weicheng 1,2,QIAO Dengpan 3,ZHOU Zhiwei 4
CLC Number:
[ 1 ] 王方汉,陈德标. 立式砂仓絮凝浓缩泥浆技术研究与应用[J].金属矿山,2000(1):21-24.Wang Fanghan,Chen Debiao. Study and application of the technology of slime pulp flocculation and thickening in a vertical sand bin[J].M etal Mine,2000(1):21-24. |
[1] | ZHANG Qinli,WANG Jing,WANG Xinmin. Failure Risk Assessment Model of Filling Pipeline Based on KPCA and PSO-SVM [J]. Gold Science and Technology, 2017, 25(3): 70-76. |
[2] | DENG Gao,YANG Shan. Stability Evaluation of Goafs Based on Combined Forecasting and Variable Precision Rough Fuzzy Set [J]. Gold Science and Technology, 2017, 25(3): 98-107. |
[3] | BI Lin,ZHAO Hui,YANG Xinfeng. Study on Principle and Method for Calculation of Earthwork Volume in the DIMINE Software [J]. Gold Science and Technology, 2017, 25(3): 108-115. |
[4] | MENG Kun,LUO Zhouquan,QIN Yaguang. Study on the Stope Displacement Unstability Process Under Complex Mining Environment [J]. Gold Science and Technology, 2017, 25(2): 70-75. |
[5] | LONG Keming,WANG Liguan. Optimization of Stope Structural Parameters Based on ANSYS-R Method [J]. Gold Science and Technology, 2015, 23(6): 81-86. |
[6] | LUO Zhouquan,QIN Yaguang,ZHOU Jiming . Development of CAD Data Interface in 3D Modeling Visualized Integrated System of Goaf [J]. Gold Science and Technology, 2015, 23(5): 41-46. |
[7] | QIU Jungang, ZHANG Zhonghui, YU Bin, WANG Dawei, HOU Dengyou, DENG Qihai. A Case Research on the Solution for Old Workings in Sizhuang Mining Area of Jiaojia Gold Mine [J]. J4, 2009, 17(4): 62-64. |
|