img

Wechat

Adv. Search

Gold Science and Technology ›› 2018, Vol. 26 ›› Issue (1): 25-30.doi: 10.11872/j.issn.1005-2518.2018.01.025

Previous Articles     Next Articles

Application of Ideal Point Method in Mining Stope Structural Parameters Optimization

KANG Qian 1,3,ZHANG Qinli 3,ZHANG Chuxuan 2,3,PU Chengzhi 2,JIANG Fuliang 1   

  1. 1.School of Environment and Safety Engineering,University of South China,Hengyang    421001,Hunan,China;2.School of Nuclear Resources Engineering,University of South China,Hengyang    421001, Hunan,China;3.School of Resources and Safety Engineering,Central South University,Changsha    410083,Hunan,China
  • Received:2017-01-12 Revised:2017-03-18 Online:2018-02-28 Published:2018-05-19

Abstract:

The model for mining stope structural parameters optimization may result in“state out of balance” phenomenon when the evaluation indexes tend to the edge state.To slove this problem,the variable weight theory was introduced into the scheme evaluation of mining stope structural parameters.Combined with the ideal point method,9 indexes which influence scheme decision mostly were selected from three angles including economy,technique and safety condition,to build the variable weight and ideal point model.In the model,the variable weight which more coincidence with actual situation of each scheme were calculated by variable weight theory based on the constant weight of each evaluation indexes.Then,the quality distance of all schemes were calculated by ideal point method and the preferential order were given.The model was used in stope structural parameters optimization of a mine and the results reflected the superiority of the model in weight calculation.The optimized result is more suitable for engineering practice.

Key words: stope structural, parameters optimization, mining, variable weight theory, ideal point method, evaluation index, evaluation model

CLC Number: 

  • TD862

[ 1 ] Ataei M,Bodaghabadi S. Comprehensive analysis of slope stability and determination of stable slopes in the Chador-Malu iron ore mine using numerical and limit equilibrium methods[J].Journal of China University of Mining and Technology,2008,18(4):488-493.
[ 2 ] Wu A X,Huang M Q,Han B,et al. Orthogonal design and numerical simulation of room and pillar configurations in fractured stopes[J].Journal of Central South University,2014,21(8):3338-3344.
[ 3 ] Guo Y,Hou K. Stope structural parameters optimization of gently inclined and extremely thin orebody with room and pillar mining method[J].Electronic Journal of Geotechnical Engineering,2014,19:3707-3718.
[ 4 ] 唐礼忠,邓丽凡,翦英骅. 分段空场嗣后充填采矿法采场结构参数优化研究[J].黄金科学技术,2016,24(2):8-13.Tang Lizhong,Deng Lifan,Jian Yinghua. Study on the optimization of structural parameters of sublevel open stopping with subsequent backfilling mining[J].Gold Science and Technology,2016,24(2):8-13.
[ 5 ] Zhu S Y,Jian Z Q,Hou H L,et al. Analytical model and application of stress distribution on mining coal floor[J].Journal of China University of Mining and Technology,2008,18(1):13-17.
[ 6 ] 刘洪强,张钦礼,潘常甲,等. 空场法矿柱破坏规律及稳定性分析[J].采矿与安全工程学报,2011,28(1):138-143.Liu Hongqiang,Zhang Qinli,Pan Changjia,et al. Analysis of the failure law and stability of the pillar in open stope mining[J].Journal of Mining and Safety Engineering,2011,28(1):138-143.
[ 7 ] Gui Y L,Bui H H,Kodikara J,et al. Modelling the dynamic failure of brittle rocks using a hybrid continuum-discrete element method with a mixed-mode cohesive fracture model[J].International Journal of Impact Engineering,2016,87:146-155.
[ 8 ] 任红岗,谭卓英,蔡学峰,等. 分段空场嗣后充填法采场结构参数AHP-Fuzzy优化[J].北京科技大学学报,2010,32(11):1383-1387.Ren Honggang,Tan Zhuoying,Cai Xuefeng,et al. AHP-Fuzzy optimization of structural parameters in sublevel open stope succedent filling method[J].Journal of University of Science and Technology Beijing,2010,32(11):1383-1387.
[ 9 ] 刘钦,刘志祥,刘爱华,等. 金矿采场结构参数混沌优化[J].采矿与安全工程学报,2010,27(4):548-552.Liu Qin,Liu Zhixiang,Liu Aihua,et al. Chaotic optimization of structural parameters in gold mining field[J].Journal of Mining & Safety Engineering,2010,27(4):548-552.
[ 10 ] 彭康,李夕兵,彭述权,等. 基于响应面法的海下框架式采场结构优化选择[J].中南大学学报,2011,42(8):2417-2422.Peng Kang,Li Xibing,Peng Shuquan,et al. Optimization of frame stope structure parameters based on response surface method in under-sea mining[J].Journal of Central South University,2011,42(8):2417-2422.
[ 11 ] 程健,张钦礼,薛希龙,等. 基于 AHP 和 TOPSIS 法的采场结构参数优化研究[J].矿冶工程,2014,34(1):1-5.Cheng Jian,Zhang Qinli,Xue Xilong,et al. Optimization of stope structure parameters based on AHP and TOPSIS method[J].Mining and Metallurgical Engineering,2014,34(1):1-5.
[ 12 ] 王新民,李天正,陈秋松,等. 基于变权重理论和TOPSIS 的充填方式优选[J].中南大学学报,2016,47(1):198-203.Wang Xinmin,Li Tianzheng,Chen Qiusong,et al. Filling way optimization based on variable weight theory and TOPSIS [J].Journal of Central South University,2016,47(1):198-203.
[ 13 ] 左红艳,罗周全,王益伟,等. 基于模糊自适应变权重算法的采场冒顶函数链神经网络预报[J].中国有色金属学报,2011,21(4):894-900.Zuo Hongyan,Luo Zhouquan,Wang Yiwei,et al. Prediction of functional link neural network of roof caving based on fuzzy adaptive variable weight method[J].The Chinese Journal of Nonferrous Metals,2011,21(4):894-900.
[ 14 ] Li H X,Chen C L P,Lee E S. Factor space theory and fuzzy information processing—Fuzzy decision making based on the concepts of feedback extension[J].Computers and Mathematics with Applications,2000,40(6):845-864.
[ 15 ] Li H X,Chen C L P,Yen V C,et al. Factor spaces theory and its applications to fuzzy information processing:Two kinds of factor space canes[J].Computers and Mathematics with Applications,2000,40(6):835-843.
[ 16 ] Donckels B M R,De Pauw D J W,Vanrolleghem P A,et al. An ideal point method for the design of compromise experiments to simultaneously estimate the parameters of rival mathematical models[J].Chemical Engineering Science,2010,65(5):1705-1719.
[ 17 ] 贾义鹏,吕庆,尚岳全,等. 基于粗糙集—理想点法的岩爆预测[J].浙江大学学报,2014,48(3):498-503.Jia Yipeng,Lü Qing,Shang Yuequan,et al. Rockburst predicition based on rough set and ideal point method[J].Journal of Zhejiang Unversity,2014,48(3):498-503.
[ 18 ] 王新民,李洁慧,张钦礼,等. 基于 FAHP 的采场结构参数优化研究[J].中国矿业大学学报,2010,39(2):163-168.Wang Xinmin,Li Jiehui,Zhang Qinli,et al. Optimizing mining stope structural parameters using a FAHP[J].Journal of China University of Mining and Technology,2010,39(2):163-168.
[ 19 ] 赵彬,李小贝,戴兴国,等. 基于变权重理论的边坡稳定性未确知分析[J].黄金科学技术,2016,24(6):90-95.Zhao Bin,Li Xiaobei,Dai Xingguo,et al. Uncertainty measurement analysis of slope stability based on variable weight theory[J].Gold Science and Technology,2016,24(6):90-95.
[ 20 ] Li H X,Li L X,Wang J Y,et al. Fuzzy decision making based on variable weights[J].Mathematical and Computer Modelling,2004,39(2):163-179.

Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!