img

Wechat

Adv. Search

Gold Science and Technology ›› 2017, Vol. 25 ›› Issue (6): 83-91.doi: 10.11872/j.issn.1005-2518.2017.06.083

Previous Articles     Next Articles

Research and Development of Integration System of Block Caving Ore Drawing Optimization Control and Intelligent Management

ZHU Zhonghua 1,2,WANG Liguan2,TAO Ganqiang1,PU Chengzhi1   

  1. 1.Nuclear Resources Engineering College,University of South China,Hengyang    421001,Hunan,China;
    2.Research Center of Digital Mine,Central South University,Changsha    410083,Hunan,China
  • Received:2016-08-04 Revised:2016-12-06 Online:2017-12-30 Published:2018-05-18

Abstract:

In order to realize scientific and reasonable ore drawing control and management of block caving method in the new period,a new integration system of block caving ore drawing optimization control and intellgent management was developed by using C++ programming language and hoops visual package.The system construction steps are as follows:①Analyzed the business requirements of block caving ore drawing optimization control and intelligent management system,and determined the system software requirements.②Proposed the software architecture of hierarchical platform and plug-in,the plug-in was used as the plug-in type of the system,and designed the plug-in interface.③Analyzed the characteristics of the data which drawing process related to,determined the basic design requirements of drawing data model of block caving mine and data management mode,designed the data structure of the system,SQLite database was used to store and manage data.④Functional structure of the system was designed according to the requirements,a set of software and hardware application system was developed,which based on the simulation analysis of mine rock flow and resource model data,and cored in economic evaluation of mineral resources exploitation,production scheduling optimization,and the intelligent management of the production process.The mine application example shows that the system can meet the demands of drawing control and intelligent management system of block caving mining enterprises,and has a good application prospects.

Key words: ore drawing control, ore and rock flow, drawing management, data management, intelligent management , system, block caving

CLC Number: 

  • TD862

[1] Trueman R,Castro R,Halim A.Study of multiple draw-zone interaction in block caving mines by means of a large 3D physical model[J].International Journal of Rock Mechanics and  Mining Science,2008,45(7):1044-1051.
[2] Feng Xinglong.Study on Digital Assessment and Simulation Technology at Rock Mass Engineering Quality of Block Caving[D].Changsha:Central South University,2010.[冯兴隆.自然崩落法矿岩工程质量数字化评价及模拟技术研究[D].长沙:中南大学,2010.]
[3] Tao Ganqiang,Ren Qingyun,Ma Jiaoyang.Ore drawing rules produced by poly-drawpoints based on kinematic model[J].Journal of China Coal Society,2012,37(3):407-410.[陶干强,任青云,马骄阳.基于运动学模型的多漏口放矿规律[J].煤炭学报,2012,37(3):407-410.]
[4] Zhu Zhonghua,Wang Liguan,Tu Xiaoteng,et al.Flow characteristics of discrete ore rock of block caving based on stochastic medium theory[J].Journal of Northeastern University(Natural Science),2016,37(6):869-874.[朱忠华,王李管,涂小腾,等.基于随机介质理论的自然崩落法崩落矿岩流动特性研究[J].东北大学学报(自然科学版),2016,37(6):869-874.]
[5] Zeng Qingtian,Liu Kewei,Yan Ti,et al.Study on natural caving mining method based on multi-numerical simulation method[J].Gold Science and Technology,2015,23(1):66-73.[曾庆田,刘科伟,严体,等.基于多数值模拟方法联合的自然崩落法开采研究[J].黄金科学技术,2015,23(1):66-73.]
[6] Yang Cailiang,Ma Jianjun.Study of the computer random simulation of ore drawing for caving method[J].Mining Research and Development,2004,24(6):57-58.[杨才亮,马建军.崩落法放矿计算机随机模拟的研究[J].矿业研究与开发,2004,24(6):57-58.]
[7] Liu Xiaobo,Sun Huoran,Zhao Dexiao,et al.Software design and development computer simulation system for ore caving-drawing[J].Metal Mine,2002(12):49-52.[柳小波,孙豁然,赵德孝,等.崩落放矿计算机仿真系统软件的设计与开发[J].金属矿山,2002(12):49-52.]
[8] Li Changning.Computer simulation of heterogeneous loose body drawing[J].Nonferrous Metals,2002,54(2):98-103.[李昌宁.非均匀矿岩散体放矿的计算机模拟[J].有色金属,2002,54(2):98-103.]
[9] Brown E T.Block Caving Geomechanics[M].Queensland:Julius Kruttschnitt Mineral Research Centre,2002.
[10] Liu Xiaoming,Luo Zhouquan,Xu Jicheng,et al.Resources extraction planning model of large-scale mine and its application[J].Journal of Central South University(Science and Technology),2014,45(8):2812-2816.[刘晓明,罗周全,徐纪成,等.大型矿区资源开采规划模型的建立及其应用[J].中南大学学报(自然科学版),2014,45(8):2812-2816.]
[11] Diering T.PC-BC:A block cave design and draw control system[C]//Proceedings of MassMin.Brisbane:The Australasian Institute of Mining and Metallurgy,2000:305-335.
[12] Zhu Zhonghua,Wang Liguan,Bi Lin,et al.Study on  subsidence prediction of underground mine and its implementation based on VTK [J].Journal of Fuzhou University(Natural Science Edition),2015,43(3):416-421.[朱忠华,王李管,毕林,等.基于VTK的地下矿开采沉陷预计研究与实现[J].福州大学学报(自然科学版),2015,43(3):416- 421.]
[13] Bi Siwen,Yin Zuoru,He Xiaoqun,et al.Concept,framework,connotation and application demonstration of digital mine[J].Science & Technology Review,2004(6):39-63.[毕思文,殷作如,何晓群,等.数字矿山的概念、框架、内涵及应用示范[J].科技导报,2004(6):39-63.]
[14]  Zhu Zhonghua,Wang Liguan,Tan Zhenghua,et al.Oredraw scheme optimization of block caving based on ore resource value model under 3D platform[J].Gold Science and Technology,2016,24(1):80-85.[朱忠华,王李管,谭正华,等.三维平台下基于资源价值模型的自然崩落法放矿方案优化[J].黄金科学技术,2016,24(1):80-85.]
[15] Wang Yibin,Liu Kui,Wang Yang.Research and practice of software architecture[J].Computer Technology and Development,2007,17(9):142-146.[王一宾,刘奎,汪洋.软件体系结构研究与实践[J].计算机技术与发展,2007,17(9):142-146.]
[16] Zhang Yousheng,Chen Songqiao.Design and implementation of layered software architecture[J].Computer Engineering and Application,2002(22):154-157.[张友生,陈松乔.层次式软件体系结构的设计与实现[J].计算机工程与应用,2002(22):154-157.]
[17] Li Jun’e,Zhou Dongru.The platform/plug-in software architecture style[J].Journal of Chinese Computer Systems,2007,28(5):876-881.[李俊娥,周洞汝.“平台/插件”软件体系结构风格[J].小型微型计算机系统,2007,28(5):876-881.]
[18] Wang Shan,Sa Shixuan.Introduction to Database System[M].Beijing:Higher Education Press,2006.[王珊,萨师煊.数据库系统概论[M].北京:高等教育出版社,2006.]
[19] Wang Runhuai.Research on Three-dimensional Data Models of Geological Objects in Mine [D].Chengdu:Southwest Jiaotong University,2007.[王润怀.矿山地质对象三维数据模型研究[D].成都:西南交通大学,2007.]
[20] Huang Mu,Shi Yehui,Li Dapeng.A method of establishing geologic model based on B-rep data structure[J].Journal of Geotechnical Investigation & Surveying,2013,41(11):67-70.[黄牧,施烨辉,李大鹏.一种基于B-rep的地质模型建立方法[J].工程勘察,2013,41(11):67-70.]
[21] Song Zhe,Liu Yancong,Niu Wenjie.Implementation algorithm of TIN model in GIS[J].Computer Applications,2003,23(12):94-96.[宋哲,刘衍聪,牛文杰.GIS中TIN模型的实现算法[J].计算机应用,2003,23(12):94-96.]

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!