Wechat
J4 ›› 2010, Vol. 18 ›› Issue (5): 72-75.
• article • Previous Articles Next Articles
XU Dong,HU Zhongqiang
Received:
Revised:
Online:
Published:
Abstract:
The ore body type of the ⅴ# ore body in Xincheng gold mine is the typical thick broken ore body.Based on the actual situation of the mine,decide to mine the ore body with the pre-roof-controlled upward mediumlength hole sublevel mining with backfill.By the pre-roof-controlling, to ensure the roof and upper wall safety, moreover with the upward medium-length hole mining,mining the ore body safety and efficacy came true.
Key words: Medium-length hole mining, Pre-roof-control, Sublevel mining with backfill, Tailing filling
CLC Number:
XU Dong,HU Zhongqiang. Study and Application of Medium-length Hole Mining in Xincheng Gold Mine[J].J4, 2010, 18(5): 72-75.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2010/V18/I5/72
[1]北京有色冶金设计研究总院.采矿设计手册2:矿床开采卷[M].北京:中国建筑工业出版社,1989. [2]古德生,李夕兵.现代金属矿床开采科学技术[M].北京:冶金工业出版社,2006:125- 158. [3]张存勇,熊正莲,尹剑飞,等.新城金矿床控矿因素及深部成矿预测[J].黄金,2002,23(6). [4]韦华南,赵国彦,古德生.新城金矿盘区上向高分层连续回采充填采矿法试验研究[R].第八届国际充填采矿会议论文,2004.
Cited