黄金科学技术 ›› 2022, Vol. 30 ›› Issue (5): 713-723.doi: 10.11872/j.issn.1005-2518.2022.05.062
苏华友1(),王永定2,谭宝会1(),龙卫国2,杨宁1,张志贵1,陈星明1
Huayou SU1(),Yongding WANG2,Baohui TAN1(),Weiguo LONG2,Ning YANG1,Zhigui ZHANG1,Xingming CHEN1
摘要:
在龙首矿西二采区无底柱分段崩落法采场形成覆盖层的过程中,掌握顶板胶结充填体的冒落机理及其发展过程,对于覆盖层的顺利形成及采矿安全具有重要意义。研究提出了人工诱导顶板大面积胶结充填体冒落形成覆盖层的技术方案,并在该方案实施过程中采用微震监测技术对胶结充填体的冒落过程进行了监测。研究结果表明:胶结充填体的破裂事件主要发生在1 610~1 630 m水平之间,其破坏机理主要划分为3种模式:一是崩落法采动压力集中在采空区后方20~45 m范围内造成的充填体压裂破坏;二是采空区边缘处剪应力集中造成的充填体岩梁剪切破坏;三是采空区顶板中央位置发生的充填体下沉弯曲拉伸破坏。理论计算结果表明:顶板胶结充填体以散体形式发生冒落的高度约为14 m。现场出矿跟踪过程中观察到冒落的胶结充填体块度在0.6~2.0 m之间。综合各项研究结果可知:在首采分段回采过程中实现了顶板胶结充填体的安全诱导冒落,形成了由预留矿石层和冒落胶结充填体构成的总厚度约为30 m的散体覆盖层,满足无底柱分段崩落法安全生产的需求。
中图分类号:
Cao Jianli,2017.Study on Falling Law and Its Applicationof Magnesite Orebody and Rock with Multi-mined-out Areas[D].Shenyang:Northeastern University. | |
Fu Jianxin, Zhu Pengrui, Song Weidong,et al,2020.Caving height prediction of caving method based on time-delay nonlinear MGM model [J].Journal of Mining and Safety Engineering,37(4):741-749. | |
Gu Shuancheng, Fan Qi, Wang Jianwen,et al,2012.Study on calculation method of roof caving arch height in layered rock roadway [J].Coal Engineering,44(12):73-76. | |
He L, Zhang Q B,2015.Numerical investigation of arching mechanism to underground excavation in jointed rock mass[J].Tunnelling and Underground Space Technology,50(8):54-67. | |
He Rongxing, Ren Fengyu, Cao Jianli,et al,2015.Goaf monitoring based on RG win logger and it’s application [J].Metal Mine,44(8):120-124. | |
Hou Gongyu, Hu Tao, Li Zixiang,et al,2020.Experimental study on overburden deformation evolution under mining effect based on distributed fiber optical sensing technology [J].Rock and Soil Mechanics,41(3):970-979. | |
Huang Qisong, Cheng Jiulong, Ding Houcheng,et al,2019.Influence of impact load induced by large-scale roof caving on the failure characteristics of mining floor [J].Journal of Mining and Safety Engineering,36(6):1228-1233,1239. | |
Li Haiying, Ren Fengyu, Zhao Yunfeng,et al,2020.Calculation model of range of surface subsidence caused by the caving in mined-out area of metal mine[J].Mining and Metallurgical Engineering,40(5):5-8. | |
Li L C, Tang C A, Zhao X D,et al,2014.Block caving-induced strata movement and associated surface subsidence:A numerical study based on a demonstration model[J].Bulletin of Engineering Geology and the Environment,73(4):1165-1182. | |
Li Nan, Chang Shuai, Ren Fengyu,2016.Technology of controlling roof falling hazard about synchronous caving in upper and lower mining areas [J].Metal Mine,45(9):62-65. | |
Liu Jianpo, Wei Dengcheng, Shi Hongxu,et al,2021.Temporal and spatial characteristics of micro-seismic events during roof sliding caving in deep metal mine [J].Metal Mine,50(11):13-18. | |
Ren Fengyu, Han Zhiyong, Zhao Enping,et al,2007.Induced caving technique and it’s application in Beiminghe iron mine[J].Mining Research and Development,27(1):17-19. | |
Tan B H, Ren F Y, Ning Y J,et al,2018.A new mining scheme for hanging-wall ore-body during the transition from open pit to underground mining:A numerical study[J].Advances in Civil Engineering,10:1465672.1-1465672.17. | |
Vyazmensky A, Elmo D, Stead D,2010.Role of rock mass fabric and faulting in the development of block caving induced surface subsidence[J].Rock Mechanics and Rock Engineering,43(5):533-556. | |
Wang J, Yang S, Li Y,et al,2014.Caving mechanisms of loose top-coal in longwall top-coal caving mining method[J].International Journal of Rock Mechanics and Mining Sciences,71(8):160-170. | |
Wu Shuanjun, Zhang Zhigui, Wang Yongding,et al,2021.Application of induced caving technology in formation of overburden layer for caving mining method in Longshou mine[J].Mining Research and Development,41(10):14-21. | |
Xu N X, Zhang J Y, Tian H,et al,2016.Discrete element modeling of strata and surface movement induced by mining under open-pit final slope[J].International Journal of Rock Mechanics and Mining Sciences,88(10):61-76. | |
曹建立,2017.多空区菱镁矿矿岩冒落规律及其应用研究[D].沈阳:东北大学. | |
付建新,朱鹏瑞,宋卫东,等,2020.基于时滞非线性MGM模型的崩落法开采冒落高度预测研究[J].采矿与安全工程学报,37(4):741-749. | |
谷拴成,樊琦,王建文,等,2012.层状岩体巷道顶板冒落拱高度计算方法研究[J].煤炭工程,44(12):73-76. | |
何荣兴,任凤玉,曹建立,等,2015.基于RG井下电视系统的空区冒落监测[J].金属矿山,44(8):120-124. | |
侯公羽,胡涛,李子祥,等,2020.基于分布式光纤技术的采动影响下覆岩变形演化规律试验研究[J].岩土力学,41(3):970-979. | |
黄琪嵩,程久龙,丁厚成,等,2019.大范围顶板岩体垮落冲击动载对采场底板破坏的影响研究[J].采矿与安全工程学报,36(6):1228-1233,1239. | |
李海英,任凤玉,赵云峰,等,2020.金属矿空区冒落诱发地表塌陷范围的计算模型探讨[J].矿冶工程,40(5):5-8. | |
李楠,常帅,任凤玉,2016.崩落法纵向分区开采冒落危害防治技术[J].金属矿山,45(9):62-65. | |
刘建坡,魏登铖,师宏旭,等,2021.深部金属矿采场顶板滑移冒落微震时空演化规律[J].金属矿山,50(11):13-18. | |
任凤玉,韩智勇,赵恩平,等,2007.诱导冒落技术及其在北洺河铁矿的应用[J].矿业研究与开发,27(1):17-19. | |
武拴军,张志贵,王永定,等,2021.诱导冒落在龙首矿崩落法覆盖层形成中的应用[J].矿业研究与开发,41(10):14-21. |
[1] | 刘业繁,石英. 磷石膏胶结充填体动态力学特性研究[J]. 黄金科学技术, 2022, 30(4): 574-584. |
[2] | 张淦,陶干强,吴宇轩. 基于改流体放矿技术的放矿口尺寸试验研究[J]. 黄金科学技术, 2021, 29(3): 364-371. |
[3] | 宋春辉, 李祥龙, 王建国, 宋飞. 矿柱爆破回采对胶结充填体损伤影响试验研究[J]. 黄金科学技术, 2020, 28(4): 558-564. |
[4] | 叶永飞,张雅楠,李士超,曹世荣,韩建文,王晓军. 循环载荷下胶结充填体损伤声发射表征[J]. 黄金科学技术, 2018, 26(6): 819-825. |
[5] | 李文臣,郭利杰,陈鑫政,李宗楠,李欣. 尾砂胶结充填体三维空间强度分布相似模拟试验研究[J]. 黄金科学技术, 2018, 26(4): 528-534. |
[6] | 王新民, 赵茂阳, 荣帅, 王浩, 张云海. APAM对全尾砂胶结充填体早期强度影响研究[J]. 黄金科学技术, 2018, 26(3): 305-311. |
[7] | 任助理,王李管. 基于金属价格不确定性的地下矿生产计划风险分析[J]. 黄金科学技术, 2017, 25(6): 52-60. |
[8] | 曹世荣,韩建文,李永欣,王晓军 *,冯萧,卓毓龙. 基于声发射概率密度函数固废胶结充填体损伤分析[J]. 黄金科学技术, 2017, 25(6): 92-98. |
[9] | 曹世荣,肖伟晶,李永欣,王晓军,卓毓龙,冯萧. 循环载荷下块石胶结充填体声发射特性研究[J]. 黄金科学技术, 2017, 25(3): 92-97. |
[10] | 田波, 李殿辉. 提高充填体强度的技术措施[J]. J4, 2005, 13(1-2): 51-54. |
|