缓倾斜破碎矿体高效进路充填采矿方法研究与应用

张宏伟(),张富兴,孙胜,郭正成   

  1. 招金矿业股份有限公司,山东 招远 265400
  • 收稿日期:2020-12-18 修回日期:2021-05-28 出版日期:2021-12-31 发布日期:2022-03-07
  • 作者简介:张宏伟(1988-),男,山东诸城人,硕士研究生,从事采矿技术研究工作。zhw170123@163.com

Research and Application of High-efficiency Drift Backfill Mining Method in Gently Inclined Broken Orebody

Hongwei ZHANG(),Fuxing ZHANG,Sheng SUN,Zhengcheng GUO   

  1. Zhaojin Mining Industry Co. ,Ltd. ,Zhaoyuan 265400,Shandong,China
  • Received:2020-12-18 Revised:2021-05-28 Online:2021-12-31 Published:2022-03-07

摘要:

大尹格庄金矿1#矿体-496 m中段北区矿体为典型的缓倾斜薄至中厚矿体,采用点柱式上向水平分层充填法落矿时,存在安全性差、生产效率低和矿石损失率高等问题。为保证采场作业安全,实现高效生产,提出小规格上向水平进路分层充填采矿法,采场地压得到有效控制,并就其回采工艺、爆破工艺和充填接顶等关键问题进行改进,矿山生产效率得到有效提升。改进采矿方法后盘区综合生产能力为372 t/d,月出矿量为11 000 t,与原采矿方法基本相同,但采矿损失率由15%降低至5.7%,资源回收率或回采率显著提高,工业试验表明:新采矿方法具备安全高效的生产特点,满足技术经济指标要求,其研究成果可用于指导矿山生产,取得了显著的经济效益和社会效益。

关键词: 破碎矿体, 上向水平进路分层充填, 采矿工艺, 爆破工艺, 高效开采, 充填采矿法

Abstract:

The orebody in the north area of the -496 m middle section of the No.1 orebody in Dayingezhuang gold mine is a typical gently inclined thin to medium thick orebody,which has the characteristics of small dip angle,large ground pressure and broken orebody.Aiming at the first seam,the point pillar upward flat-back cut and fill method was used to mining the orebody,and the exposed area of the chamber is large,making it vulnerable to collapse.Even if more point pillars were done,poor mining security was still threatening the production safety,and there are shortcomings such as poor operation conditions,low production efficiency and high rate of ore loss.In order to ensure the safety of stope operation,realize high-efficiency production and reduce the ore loss,the small size upward drift backfill mining method was proposed.This method is proposed in consideration of the mining technical conditions,mining status and development needs of Dayingezhuang gold mine,combined with the mining experience and development trend of similar gold mines in Jiaodong Peninsula.Some key problems such as mining technology,blasting technology and roof filling were optimized and improved,and the expected effect was achieved.The industrial test shows that under the condition of the same drilling time and the drilling length are basically the same,the production capacity of the panel is 372 t/d and the monthly ore output is 11 000 t,and the comprehensive ore production capacity is basically the same as the original mining method.Unit explosive consumption was only 0.26 kg/t,28% lower than the original mining method.The ore loss rate is only 5.7%,62% lower than the original mining method,recovery has been significantly increased.By using cemented fills instead of concrete seperation wall,the construction period is shortened from 5.5 days to 2.5 days,effectively solving the problem of drift stope replacement.The new mining method has the benefits of safe and efficient production and meets the requirements of technical and economic indicators.The research results of the new mining method can be used to guide the mine production and provide technical base for the production target of reaching 5 000 t/d.At the same time,it can be used for reference by other similar mines with remarkable economic and social benefits.

Key words: broken orebody, upward horizontal approach layered filling method, mining technology, blasting process, high-efficient mining, filling mining method

中图分类号: 

  • TD853

图1

大尹格庄金矿上向水平分层进路充填采矿法示意图"

图2

开采现场施工图"

表1

2种采矿方法主要技术经济指标对比"

采矿方法盘区生产能力 /(t·d-1凿岩台效 /(t·台班-1损失率/%贫化率/%采切比 /(m·kt-1采矿直接成本 /(元·t-1
原采矿方法384192156.26.421.53
小规格上向水平进路分层充填法3721865.75.416.827.81

图3

炮孔布置示意图"

表2

主要爆破技术经济参数对比"

爆破方案单机凿岩时间/h单机凿岩进尺/m进尺率/%单位炸药消耗量/(kg·t-1单位导爆管雷管消耗量/(发·t-1单位导爆索消耗量/(m·t-1
点柱式3121500.360.180.24
初始方案3119520.350.230.41
改进方案3117460.260.110.53

图4

圆木隔挡施工图(a)和胶结充填体挡墙(b)"

null Cao Yingli, Qin Xiuhe, Zhang Ruizhong, al et,2012.Research and application of mining method of horizontal stratified entrance filling of tailing in Xiadian gold mine[J].Gold Science and Technology,20(2):62-66.
null Dong Jinkui,2015.Dynamic Control and Stabiligy Analysis of Gentle Dip and Medium Thickness Orebody in Jiaojia Gold Mine[D].Shenyang:Northeastern University.
null Feng X T, Hudson J,2004.The ways ahead for rock engineering design methodologies[J].International Journal of Rock Me-chanics and Mining Sciences,41(2):255-273.
null Feng X T, Hudson J.Rock Engineering Design[M]. London:CRC Press,2011:322-341.
null Jin C Y, Yang C X, Fang D, al et,2015.Study on the failure mechanism of basalts with columnar joints in the unloading process on the basis of an experimental cavity[J].Rock Mechanics and Rock Engineering,48(3):1275-1288.
null Lai Wei, Guo Qinqiang, Liu Xiaosheng, al et,2020.Upward drift filling mining method for unstable and gently inclined thin to medium thick ore body[J].Nonferrous Metals(Mine Section),72(4):29-32,47.
null Li Jiang, Jiang Lei, Wu Feng, al et,2015.Stability analysis and parameter optimization of deep stope in Dayingezhuang gold mine[J].Gold,36(4):43-45,58.
null Li Shupeng, Jiang Lei, Zhang Junpeng,2016.Application of mechanized upward horizontal slicing method in Dayingezhuang gold mine[J].Gold,37(8):43-46.
null Liu Dong, Shao Anlin, Jin Changyu, al et,2019.Numerical model building for broken ore body and optimization of stope structural parameters[J].Journal of Central South Uni-versity(Science and Technology),50(2):437-444.
null Liu Mingquan, Li Xiuchen, Jiang Guojian, al et,2009.Evolution and optimization of mining method in Dayingezhuang gold mine[J].Metal Mine,(Supp.1):215-218,222.
null Liu Tao, Gao Longtao, Sui Yongle, al et,2011.The mining method of broken orebody in Hubazhuang gold mine,Shandong Province[J].Gold Science and Technology,19(5):29-32.
null Ning Yulin, Hu Shouquan, Liang Chao, al et,2014. Optimized research on advanced height of ore-body with broken hanging wall under upward slicing stoping with backfilling[J].Mining Research and Development,34(4):4-7.
null Saki F, Dehghani H, Shokri B J, al et,2020.Determination of the most appropriate tools of multi-criteria decision analysis for underground mining method selection——A case study[J]. Arabian Journal of Geosciences,13(23):1-20.
null Tang Lizhong, Deng Lifan, Jian Yinghua,2016.Study on the optimization of structural parameters of sublevel open stopping with subsequent backfilling mining[J].Gold Science and Technology,24(2):8-13.
null Vongpaisal S, Li G, Pakalnis R, al et,2011.New development of expert system module for a decision-making on mine stope stability in underground blasthole mining operations[J].International Journal of Mining,Reclamation and Environment,25(1):41-51.
null Wang Zhiyuan, Zhang Wenru, Liu Qianyong, al et,2018.Research and practice on safe and efficient mining of orebody under complex conditions[J].Mining Research and Development,38(5):10-12.
null Wu Feng, Li Jiang, Liu Lu, al et,2013.Study on mining technology of thick,large and gently inclined fractured orebody in Dayingezhuang gold mine[J].Modern Mining,29(11):147-148,151.
null Yang Ning, Yin Xiangang, Lin Weixing, al et,2020.In-vein upward horizontal slicing and filling method[J].Mining Research and Development,40(5):11-14.
null Yang Ying, Wu Aixiang, Yin Shenghua, al et,2016.Upward drift stoping with backfill for the gently inclined orebody with the thickness from thin to medium thick under the river[J].Mining Research and Development,36(3):1-4.
null Yang Yong, Cao Xueyong, Zhang Haitao,2010.Research of the mining method of the broken orebody on the north limb of Jiaojia gold mine,Shandong Province[J].Gold Science and Technology,18(2):51-52.
null Xu Heng, Wang Yiming, Wu Aixiang, al et,2016.Upward drift paste backfill mining technique in the gently inclined and broken ore deposit[J].Metal Mine,45(8):12-18.
null Zhou Zonghong,2006.Research on Low-dilution and Loss Sublevel Caving of Inclined Medium-thick Orebody in Xiadian Gold Mine[D].Shenyang:Northeastern University.
null Zhu Heling,2014.Soft Broken-complex Orebody Mining Technology Optimization and Process Control Research[D].Changsha:Central South University.
null 曹英莉,秦秀合,张瑞忠,等,2012.夏甸金矿水平分层进路式尾砂充填采矿法的研究与应用[J].黄金科学技术,20(2): 62-66.
null 董金奎,2015.焦家金矿破碎矿体高效开采稳定性分析及动态调控研究[D].沈阳:东北大学.
null 赖伟,郭勤强,柳小胜,等,2020.不稳固缓倾斜薄至中厚矿体上向进路充填采矿法[J].有色金属(矿山部分),72(4):29-32,47.
null 李江,姜磊,吴锋,等,2015.大尹格庄金矿深部采场稳定性分析与参数优化[J].黄金,36(4):43-45,58.
null 李树鹏,姜磊,张君鹏,2016.盘区机械化上向水平分层充填采矿法在大尹格庄金矿的应用[J].黄金,37(8):43-46.
null 刘冬,邵安林,金长宇,等,2019.地下破碎矿体数值计算模型的构建及采场结构参数优化[J].中南大学学报(自然科学版),50(2):437-444.
null 刘明泉,李秀臣,江国建,等,2009.大尹格庄金矿采矿方法的沿革及优化[J].金属矿山,(增1):215-218,222.
null 刘涛,高龙涛,隋永乐,等,2011.山东胡八庄金矿围岩破碎矿体采矿方法[J].黄金科学技术,19(5):29-32.
null 甯瑜琳,扈守全,梁超,等,2014.上盘破碎矿体盘区上向分层充填采矿法回采超前高度优化研究[J].矿业研究与开发,34(4):4-7.
null 唐礼忠,邓丽凡,翦英骅,2016.分段空场嗣后充填采矿法采场结构参数优化研究[J].黄金科学技术,24(2):8-13.
null 王志远,张文如,刘乾勇,等,2018.复杂条件下矿体安全高效开采研究与实践[J].矿业研究与开发,38(5):10-12.
null 吴锋,李江,刘路,等,2013.大尹格庄金矿厚大缓倾斜破碎矿体开采技术研究[J].现代矿业,29(11):147-148,151.
null 杨宁,尹贤刚,林卫星,等,2020.脉内上向水平分层充填采矿法[J].矿业研究与开发,40(5):11-14.
null 杨莹,吴爱祥,尹升华,等,2016.河流下缓倾斜薄至中厚矿体上向进路充填采矿法[J].矿业研究与开发,36(3):1-4.
null 杨勇,曹学勇,张海涛,2010.山东焦家金矿北翼破碎矿体采矿方法研究[J].黄金科学技术,18(2):51-52.
null 徐恒,王贻明,吴爱祥,等,2016.缓倾斜破碎矿床上向进路膏体充填采矿技术[J].金属矿山,45(8):12-18.
null 周宗红,2006.夏甸金矿倾斜中厚矿体低贫损分段崩落法研究[D].沈阳:东北大学.
null 朱和玲,2014.松软破碎型复杂矿体开采技术优化与过程控制研究[D].长沙:中南大学.
[1] 何建元,李宏业,高谦,尹升华. 采矿废石—尾砂混合骨料在下向分层进路胶结充填采矿中应用的试验研究[J]. 黄金科学技术, 2021, 29(4): 564-572.
[2] 宋恩祥, 李强, 张静, 彭康. 蚀变带内矿体开采中人工假底的应用研究[J]. 黄金科学技术, 2019, 27(5): 722-730.
[3] 马明辉,朱明德,陈自辉,房铖 . 三山岛金矿无架腿支护技术研究与应用[J]. 黄金科学技术, 2017, 25(5): 67-72.
[4] 王新民,胡一波,王石,刘吉祥,陈宇,卞继伟. 超细全尾砂充填配比优化正交试验研究[J]. 黄金科学技术, 2015, 23(3): 45-49.
[5] 赵龙,王楠,孙铭骏. 盘区充填采矿法二步采转层优化在三山岛金矿的应用[J]. 黄金科学技术, 2013, 21(6): 73-77.
[6] 姚松明,王建海,王小春,李洪莲,金文辉. 河南前河金矿破碎矿体探、采工程布置合理性探讨[J]. 黄金科学技术, 2013, 21(3): 73-76.
[7] 杨勇,邱英魁,杨杰,何国强,刘军晓. 山东焦家金矿爆破工艺优化研究[J]. 黄金科学技术, 2012, 20(6): 79-81.
[8] 曹英莉, 秦秀合, 张瑞忠, 高金成. 夏甸金矿水平分层进路式尾砂充填采矿法的研究与应用[J]. J4, 2012, 20(2): 62-66.
[9] 王大为,王卓,李磊,李伟宁,秦伟利,刘洪伟,李伟国. 上向水平扇形进路采矿方法的研究及应用[J]. J4, 2012, 20(2): 67-70.
[10] 刘涛,高龙涛,隋永乐,宋林夫. 山东胡八庄金矿围岩破碎矿体采矿方法[J]. J4, 2011, 19(5): 29-32.
[11] 白复锌,王善功,张永林,安智海. 山东鑫汇金矿厚度突变矿体采矿方法的选择与应用[J]. J4, 2011, 19(3): 68-69.
[12] 路仁江, 刘鹏金, 娄伟华. 高水固结充填采矿法工艺创新与应用[J]. J4, 2011, 19(1): 51-54.
[13] 徐东,胡忠强. 中深孔采矿法在新城金矿的研究与应用[J]. J4, 2010, 18(5): 72-75.
[14] 路明福, 扈守全. 厚大破碎矿体回采技术的对比研究[J]. J4, 2010, 18(4): 62-64.
[15] 修国林, 何顺斌, 于常先. 三山岛海底采矿关键技术及最优开采方案研究[J]. J4, 2010, 18(3): 9-13.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 刘胜光, 高海峰, 黄锁英. 电子手薄在山东焦家金矿地质专业中的应用[J]. J4, 2010, 18(3): 79 -82 .
[2] 柳玉明, 柳楠, 张杰, 宋玉波, 宫隆吉, 王刚, 刘晓, 张海芳. 山东英格庄金矿床构造特征研究及找矿方向[J]. J4, 2010, 18(6): 26 -29 .
[3] 伊有昌, 马财, 李月隆, 潘彤, 罗才让, 王春英. 青海省板块构造环境与成矿作用[J]. J4, 2007, 15(1): 1 -9 .
[4] 姜琪, 王荣超. 甘肃枣子沟金矿床形成环境及矿床成因[J]. J4, 2010, 18(4): 37 -40 .
[5] 原冬成, 徐小凤. 山东曹家埠金矿床的成矿机理与找矿前景[J]. J4, 2010, 18(4): 47 -49 .
[6] 陈学俊. 青海直亥买休玛金矿床矿体特征与找矿前景分析[J]. J4, 2010, 18(4): 50 -53 .
[7] 曲晖, 史瑞民. 黑龙江东安金矿成矿的构造条件分析[J]. J4, 2007, 15(1): 23 -25 .
[8] 胡琴霞, 李建忠, 喻光明, 谢艳芳, 张圣潇. 白龙江成矿带金矿点初探[J]. J4, 2010, 18(3): 51 -53 .
[9] 张华全,张维昕,李洪杰. 山东胶莱盆地金矿成矿条件及找矿方向[J]. J4, 2008, 16(2): 12 -17 .
[10] 庄宇凯,徐忠敏,冯金敏,路良山,栾作春. 酸碱联合吸收废气法在湿法冶炼中的应用[J]. J4, 2008, 16(2): 57 -59 .