Investigation of Joint Fissure and Analysis of Ore-rock Stability in Sizhuang Mining of Jiaojia Gold Deposit

DONG Jinkui1,2,SHEN Yan3,QIU Jungang2   

  1. 1.College of Resources and Civil Engineering,Northeastern University,Shenyang   110819,Liaoning,China;
    2.Jiaojia Gold Mine,Shandong Gold Group Co.,Ltd.,Laizhou   261441,Shandong,China;
    3.School of Resources and Safety Engineering,Central South University,Changsha   410083,Hunan,China
  • Received:2012-01-09 Revised:2012-03-06 Online:2012-04-28 Published:2012-08-21

Abstract:

By investigating on the joints and fissure in Sizhuang mining area of Jiaojia gold deposit,the altitude and average spacing of joint fissure of the hanging and footing wall were obtained,and the data were statistically analyzed.Using CSIR rock quality evaluation method,the rock quality index RQD was calculated by the joints density.The rock integrity coefficient was used to represent the strength of rock masses by calculating the RMR whose magnitude could indicate the stability degree of rock masses,and predicted the stope span and their stability time.The results show that more fissures develop in surrounding rock on the plate than in the orebody and footwall surrounding rock, and the rock mass strength is more influenced by the distribution of joints when the joints have angle of 30° to 75°;orebody and footwall of surrounding rock are stable,while surrounding rock on the plate has poor stability.Because of the poor stability of the surrounding rock in No.7-2 orebody,Sizhuang mine area,timely effective support is needed to limit the surrounding rock deformation and failure after exposing;Due to decreasing of surrounding rock with the decreasion of the ground elevation, stope needs timely support to ensure the safety of operations when exposed to deeper ore body.This study can be used as an important reference for optimizing of mining stope structural parameters and analyzing of its stability,and is essential value to safe production.

Key words: Joint fissure, Dominant structural surface, Rock body stability, Evaluation, Sizhuang mine area, Jiaojia gold mine

CLC Number: 

  • TD853.34

[1] 杨万托,余天堂.一种新的节理裂隙岩体弹塑性模型[J].岩土力学,2003,,2(2):270-272.
[2] 任青文.块体单元法及其在岩体稳定分析中的应用[J].河海大学学报,1995,23(1):1-7.
[3] 孙钧.地下结构有限元法解析[M].上海:同济大学出版社,1988.
[4] 任青文,余天堂.块体单元法的理论和计算模型[J].工程力学,1999,16(1):67-77.
[5] 曾芳金,金解放,钟文.某露天矿边坡破坏模式研究[J]. 江西有色金属,2008,22(1):7-10.
[6] 杨春和,包宏涛,王贵宾,等.岩体节理平均迹长和迹线中点面密度估计[J].岩石力学与工程学报,2006,25(12):2475-2480.
[7] 王渭明,李先炜.裂隙岩体优势结构面产状反演[J].岩石力学与工程学报,2004,23(11):1832-1835.
[8] 夏才初,孙宗颀.工程岩体节理力学[M].上海:同济大学出版社,2002.
[9] 丁铭,袁海平,张贤平.某矿体节理调查与统计分析[J].铜业工程,2008,(2):15-17,27.
[10] 刘刚,赵坚,宋宏伟,李元海.断续节理方位对巷道稳定性的影响[J].煤炭学报,2008,33(8):860-865.
[11] Bieniawski Z T.Engineering classification of jointed rock masses[J].Civil African,1973,15(5):335-344.

[1] CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng. Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine [J]. J4, 2012, 20(2): 62-66.
[2] WANG Dawei, WANG Zhuo,LI Lei, LI Weining,QIN Weili,LIU Hongwei, LI Weiguo. Research and Application of the Upward Horizontal Fan Drift Mining Method [J]. J4, 2012, 20(2): 67-70.
[3] LIU Fujiang,WANG Yuankui,WANG Zhenjun,WEI Kailin,WU Zhiming. Discussion on the Enhancement of Blasting Quality for Multi-jointed Fracture Ore-rock [J]. J4, 2012, 20(2): 71-73.
[4] BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69.
[5] CHEN Hong-Bing, WANG Yong-Cheng, HU Shi-Li. Stuffing and Dosage Calculation of Using High Concentration to Concrete Tailings [J]. J4, 2007, 15(3): 58-61.
[6] CHEN Hua-Zhen, SUN Chao, SONG Chang-Bao. Some Prorblems of the New Tailing Cemnent Material in the Application [J]. J4, 2006, 14(1): 32-35.
[7] MAO Zhen-Shan, LIU Hua-Qing, LI He-Beng, XUE Tian-Chi. Study on The Clot of Injection [J]. J4, 2006, 14(3): 22-25.
[8] CAO Guorong. Reasonable Underground Filling Strengthening Surface Protection [J]. J4, 2005, 13(6): 27-29.
[9] LI Xingshang,GUO Zhonglin. Application of Waste Fill in Xinqiao Mining Industry Company [J]. J4, 2004, 12(2): 41-45.
[10] LIU Xuesheng, XUE Tianxi,WANG Xiujuan. Study on the Cemenited of Separate Wall [J]. J4, 2004, 12(1): 5-7.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!