Gold Science and Technology ›› 2017, Vol. 25 ›› Issue (4): 52-57.doi: 10.11872/j.issn.1005-2518.2017.04.052

Previous Articles     Next Articles

Research on the Ore Bunker Treatment of a Gold Mine

DING Jianfeng   

  1. Qilu Mining Department of Shandong Gold Mining Co.,Ltd.,Laizhou   261400,Shandong,China
  • Received:2017-05-05 Revised:2017-07-12 Online:2017-08-30 Published:2017-10-30

Abstract:

Ore bunker is the throat project of underground metal mine.During the process of transportation,the ore is lashing and abrasion each other,which is easy to cause collapse accident of ore bunker.The good running state of ore bunker has an important influence on sustained and stable development of mine enterprise.Taking the repair of ore bunker of a gold mine as an example,the failure mechanism of ore bunker and selection of treatment scheme are introduced in detail.By comparing the advantages and disadvantages of three treatment schemes,including pipe grouting method,layered casting method and newly-built ore bunker,the results show that pipe grouting method has the best treatment effect and shortest duration,finally pipe grouting method is adoped to treatment ore bunker,it has a certain reference for engineering treatment of similar mines.

Key words:  ore bunker treatment, pipe grouting method, repair project, collapse of ore bunker, metal mine

CLC Number: 

  • TD853 

[1] Wang Qing,Ren Fengyu.Mining Science[M].Beijing:Me-tallurgical Industry Press,2011.[王青,任凤玉.采矿学[M].北京:冶金工业出版社,2011.]
[2] Chen Yumin,Li Xibing.Safety and Efficient Mining Technology for Large Submarine Metal Deposits[M].Beijing:Meta- llurgical Industry Press,2013.[陈玉民,李夕兵.海底大型金属矿床安全高效开采技术[M].北京:冶金工业出版社,2013.]
[3] Zhou Changda.Roadway Engineering[M].Beijing:Metallurgical Industry Press,1994:62-100.[周昌达.井巷工程[M].北京:冶金工业出版社,1994:62-100.]
[4] Gao Qian,Luo Xu,Wu Shunchuan,et al.Modern Geotechnical Construction Technology[M].Beijing:China Building Material Industry Press,2006.[高谦,罗旭,吴顺川,等.现代岩土施工技术[M].北京:中国建材工业出版社,2006.]
[5] Cai Meifeng.Rock Mechanics and Engineering[M].Beijing:Science Press,2002.[蔡美峰.岩石力学与工程[M].北京:科学出版社,2002.]
[6] Liu Fugao.Research on 3D detection of deep sliding well collapse and its rehabilitation scheme[J].Mining Technology,2013,13(4):26-29.[刘付高.深部溜井垮塌三维探测及其修复方法研究[J].采矿技术,2013,13(4):26-29.]
[7] Wang Tingyu,Luo Zhouquan,Qin Yaguang,et al.3D detection and visual analysis and calculation of mine ore pass collapse[J].Gold Science and Technology,2016,24(1):97-101.[王婷玉,罗周全,秦亚光,等.主溜井三维探测及可视化分析与计算[J].黄金科学技术,2016,24(1):97-101.]
[8] Xiao Wentao,Hu Quansheng,Zhang Yanping,et al.Cause analysis and maintenance technology research of orepass collapse[J].Wisco Technology,2016,54(3):42-48.[肖文涛,胡全胜,张炎平,等.采场溜井破坏原因分析与维护技术研究[J].武钢技术,2016,54(3):42-48.]
[9] Gao Yongtao,Wang Jin’an,Song Weidong,et al.A new te-chnique:Supporting funnel method used in recovering and controlling of large-scale collapsed main transportation shaft[J].Chinese Journal of Rock Methanics and Engineering,2002,21(4):540-545.[高永涛,王金安,宋卫东,等.一种治理主溜井特大塌方的新方法——托斗法[J].岩石力学与工程学报,2002,21(4):540-545.]
[10] Song Weidong,Gao Yongtao,Wu Shunchuan.Application of the technology of prestressed anchor by secondary high-pressure grouting in the reinforcement of main ore-pass No.2 at Chengchao iron mine[J].Gold,2001,22(8):18-21.[宋卫东,高永涛,吴顺川.二次高压灌浆预应力锚固技术在程潮铁矿2#主溜井加固工程中的应用[J].黄金,2001,22(8):18-21.]

[1] SHI Caixing, GUO Lijie, LI Wenchen, ZHANG Dan. Study on Filling Cementitious Materials Based on Lead-Zinc Smelting Slag and Its Application [J]. Gold Science and Technology, 2018, 26(2): 160-169.
[2] LI Zongnan,GUO Lijie,YU Bin,SHI Caixing. Shearing Thinning Behavior of High Concentration Slurry Based on Bingham Model [J]. Gold Science and Technology, 2017, 25(4): 33-38.
[3] XU Huaihao,LI Jinyou. Application Practice of Increasing Production and Reducing Consumption in Grinding System of Dayingezhuang Gold Mine [J]. Gold Science and Technology, 2017, 25(3): 116-120.
[4] WANG Xinmin,RONG Shuai,ZHAO Maoyang,ZHANG Qinli . Concentration Equipment Optimization Based on Variable Weight Theory and TOPSIS [J]. Gold Science and Technology, 2017, 25(3): 77-83.
[5] HU Jianhua,YANG Chun,ZHOU Bingren,ZHOU Keping,ZHANG Shaoguo. Simulation of Fracture Propagation and Optimization of Parameters for Smooth Blasting of Coping in Roadway [J]. Gold Science and Technology, 2017, 25(2): 45-53.
[6] JIA Mintao,WANG Qunfang,WU Lengjun. Research Status and Prospect of Thermal Environmental Control Technology Under Deep Mining [J]. Gold Science and Technology, 2017, 25(2): 83-88.
[7] LAN Zhipeng,WANG Xinmin,WANG Hongjiang,CHEN Qiusong. Experiment Research on Slurry Setting Time’s Effect on High-sulphur Backfill’s Compressive Strength [J]. Gold Science and Technology, 2016, 24(5): 13-18.
[8] DAI Xingguo,LI Yan,ZHANG Bixiao. Numerical Investigation of Depressurization Full-pipe Transportation of Paste in Deep Mine [J]. Gold Science and Technology, 2016, 24(3): 70-75.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!