Research and Application of High-efficiency Drift Backfill Mining Method in Gently Inclined Broken Orebody

Hongwei ZHANG(),Fuxing ZHANG,Sheng SUN,Zhengcheng GUO   

  1. Zhaojin Mining Industry Co. ,Ltd. ,Zhaoyuan 265400,Shandong,China
  • Received:2020-12-18 Revised:2021-05-28 Online:2021-12-31 Published:2022-03-07

Abstract:

The orebody in the north area of the -496 m middle section of the No.1 orebody in Dayingezhuang gold mine is a typical gently inclined thin to medium thick orebody,which has the characteristics of small dip angle,large ground pressure and broken orebody.Aiming at the first seam,the point pillar upward flat-back cut and fill method was used to mining the orebody,and the exposed area of the chamber is large,making it vulnerable to collapse.Even if more point pillars were done,poor mining security was still threatening the production safety,and there are shortcomings such as poor operation conditions,low production efficiency and high rate of ore loss.In order to ensure the safety of stope operation,realize high-efficiency production and reduce the ore loss,the small size upward drift backfill mining method was proposed.This method is proposed in consideration of the mining technical conditions,mining status and development needs of Dayingezhuang gold mine,combined with the mining experience and development trend of similar gold mines in Jiaodong Peninsula.Some key problems such as mining technology,blasting technology and roof filling were optimized and improved,and the expected effect was achieved.The industrial test shows that under the condition of the same drilling time and the drilling length are basically the same,the production capacity of the panel is 372 t/d and the monthly ore output is 11 000 t,and the comprehensive ore production capacity is basically the same as the original mining method.Unit explosive consumption was only 0.26 kg/t,28% lower than the original mining method.The ore loss rate is only 5.7%,62% lower than the original mining method,recovery has been significantly increased.By using cemented fills instead of concrete seperation wall,the construction period is shortened from 5.5 days to 2.5 days,effectively solving the problem of drift stope replacement.The new mining method has the benefits of safe and efficient production and meets the requirements of technical and economic indicators.The research results of the new mining method can be used to guide the mine production and provide technical base for the production target of reaching 5 000 t/d.At the same time,it can be used for reference by other similar mines with remarkable economic and social benefits.

Key words: broken orebody, upward horizontal approach layered filling method, mining technology, blasting process, high-efficient mining, filling mining method

CLC Number: 

  • TD853

Fig.1

Schematic diagram of upward horizontal layered drift filling mining method in Dayingezhuang gold mine"

Fig.2

Construction drawing of mining site"

Table 1

Comparison of main technical and economic indicators of two mining methods"

采矿方法盘区生产能力 /(t·d-1凿岩台效 /(t·台班-1损失率/%贫化率/%采切比 /(m·kt-1采矿直接成本 /(元·t-1
原采矿方法384192156.26.421.53
小规格上向水平进路分层充填法3721865.75.416.827.81

Fig.3

Schematic of blast holes arrangement"

Table 2

Comparison of main blasting technical and economic parameters"

爆破方案单机凿岩时间/h单机凿岩进尺/m进尺率/%单位炸药消耗量/(kg·t-1单位导爆管雷管消耗量/(发·t-1单位导爆索消耗量/(m·t-1
点柱式3121500.360.180.24
初始方案3119520.350.230.41
改进方案3117460.260.110.53

Fig.4

Construction drawing round timber block and cemented filling retaining wall"

null Cao Yingli, Qin Xiuhe, Zhang Ruizhong, al et,2012.Research and application of mining method of horizontal stratified entrance filling of tailing in Xiadian gold mine[J].Gold Science and Technology,20(2):62-66.
null Dong Jinkui,2015.Dynamic Control and Stabiligy Analysis of Gentle Dip and Medium Thickness Orebody in Jiaojia Gold Mine[D].Shenyang:Northeastern University.
null Feng X T, Hudson J,2004.The ways ahead for rock engineering design methodologies[J].International Journal of Rock Me-chanics and Mining Sciences,41(2):255-273.
null Feng X T, Hudson J.Rock Engineering Design[M]. London:CRC Press,2011:322-341.
null Jin C Y, Yang C X, Fang D, al et,2015.Study on the failure mechanism of basalts with columnar joints in the unloading process on the basis of an experimental cavity[J].Rock Mechanics and Rock Engineering,48(3):1275-1288.
null Lai Wei, Guo Qinqiang, Liu Xiaosheng, al et,2020.Upward drift filling mining method for unstable and gently inclined thin to medium thick ore body[J].Nonferrous Metals(Mine Section),72(4):29-32,47.
null Li Jiang, Jiang Lei, Wu Feng, al et,2015.Stability analysis and parameter optimization of deep stope in Dayingezhuang gold mine[J].Gold,36(4):43-45,58.
null Li Shupeng, Jiang Lei, Zhang Junpeng,2016.Application of mechanized upward horizontal slicing method in Dayingezhuang gold mine[J].Gold,37(8):43-46.
null Liu Dong, Shao Anlin, Jin Changyu, al et,2019.Numerical model building for broken ore body and optimization of stope structural parameters[J].Journal of Central South Uni-versity(Science and Technology),50(2):437-444.
null Liu Mingquan, Li Xiuchen, Jiang Guojian, al et,2009.Evolution and optimization of mining method in Dayingezhuang gold mine[J].Metal Mine,(Supp.1):215-218,222.
null Liu Tao, Gao Longtao, Sui Yongle, al et,2011.The mining method of broken orebody in Hubazhuang gold mine,Shandong Province[J].Gold Science and Technology,19(5):29-32.
null Ning Yulin, Hu Shouquan, Liang Chao, al et,2014. Optimized research on advanced height of ore-body with broken hanging wall under upward slicing stoping with backfilling[J].Mining Research and Development,34(4):4-7.
null Saki F, Dehghani H, Shokri B J, al et,2020.Determination of the most appropriate tools of multi-criteria decision analysis for underground mining method selection——A case study[J]. Arabian Journal of Geosciences,13(23):1-20.
null Tang Lizhong, Deng Lifan, Jian Yinghua,2016.Study on the optimization of structural parameters of sublevel open stopping with subsequent backfilling mining[J].Gold Science and Technology,24(2):8-13.
null Vongpaisal S, Li G, Pakalnis R, al et,2011.New development of expert system module for a decision-making on mine stope stability in underground blasthole mining operations[J].International Journal of Mining,Reclamation and Environment,25(1):41-51.
null Wang Zhiyuan, Zhang Wenru, Liu Qianyong, al et,2018.Research and practice on safe and efficient mining of orebody under complex conditions[J].Mining Research and Development,38(5):10-12.
null Wu Feng, Li Jiang, Liu Lu, al et,2013.Study on mining technology of thick,large and gently inclined fractured orebody in Dayingezhuang gold mine[J].Modern Mining,29(11):147-148,151.
null Yang Ning, Yin Xiangang, Lin Weixing, al et,2020.In-vein upward horizontal slicing and filling method[J].Mining Research and Development,40(5):11-14.
null Yang Ying, Wu Aixiang, Yin Shenghua, al et,2016.Upward drift stoping with backfill for the gently inclined orebody with the thickness from thin to medium thick under the river[J].Mining Research and Development,36(3):1-4.
null Yang Yong, Cao Xueyong, Zhang Haitao,2010.Research of the mining method of the broken orebody on the north limb of Jiaojia gold mine,Shandong Province[J].Gold Science and Technology,18(2):51-52.
null Xu Heng, Wang Yiming, Wu Aixiang, al et,2016.Upward drift paste backfill mining technique in the gently inclined and broken ore deposit[J].Metal Mine,45(8):12-18.
null Zhou Zonghong,2006.Research on Low-dilution and Loss Sublevel Caving of Inclined Medium-thick Orebody in Xiadian Gold Mine[D].Shenyang:Northeastern University.
null Zhu Heling,2014.Soft Broken-complex Orebody Mining Technology Optimization and Process Control Research[D].Changsha:Central South University.
null 曹英莉,秦秀合,张瑞忠,等,2012.夏甸金矿水平分层进路式尾砂充填采矿法的研究与应用[J].黄金科学技术,20(2): 62-66.
null 董金奎,2015.焦家金矿破碎矿体高效开采稳定性分析及动态调控研究[D].沈阳:东北大学.
null 赖伟,郭勤强,柳小胜,等,2020.不稳固缓倾斜薄至中厚矿体上向进路充填采矿法[J].有色金属(矿山部分),72(4):29-32,47.
null 李江,姜磊,吴锋,等,2015.大尹格庄金矿深部采场稳定性分析与参数优化[J].黄金,36(4):43-45,58.
null 李树鹏,姜磊,张君鹏,2016.盘区机械化上向水平分层充填采矿法在大尹格庄金矿的应用[J].黄金,37(8):43-46.
null 刘冬,邵安林,金长宇,等,2019.地下破碎矿体数值计算模型的构建及采场结构参数优化[J].中南大学学报(自然科学版),50(2):437-444.
null 刘明泉,李秀臣,江国建,等,2009.大尹格庄金矿采矿方法的沿革及优化[J].金属矿山,(增1):215-218,222.
null 刘涛,高龙涛,隋永乐,等,2011.山东胡八庄金矿围岩破碎矿体采矿方法[J].黄金科学技术,19(5):29-32.
null 甯瑜琳,扈守全,梁超,等,2014.上盘破碎矿体盘区上向分层充填采矿法回采超前高度优化研究[J].矿业研究与开发,34(4):4-7.
null 唐礼忠,邓丽凡,翦英骅,2016.分段空场嗣后充填采矿法采场结构参数优化研究[J].黄金科学技术,24(2):8-13.
null 王志远,张文如,刘乾勇,等,2018.复杂条件下矿体安全高效开采研究与实践[J].矿业研究与开发,38(5):10-12.
null 吴锋,李江,刘路,等,2013.大尹格庄金矿厚大缓倾斜破碎矿体开采技术研究[J].现代矿业,29(11):147-148,151.
null 杨宁,尹贤刚,林卫星,等,2020.脉内上向水平分层充填采矿法[J].矿业研究与开发,40(5):11-14.
null 杨莹,吴爱祥,尹升华,等,2016.河流下缓倾斜薄至中厚矿体上向进路充填采矿法[J].矿业研究与开发,36(3):1-4.
null 杨勇,曹学勇,张海涛,2010.山东焦家金矿北翼破碎矿体采矿方法研究[J].黄金科学技术,18(2):51-52.
null 徐恒,王贻明,吴爱祥,等,2016.缓倾斜破碎矿床上向进路膏体充填采矿技术[J].金属矿山,45(8):12-18.
null 周宗红,2006.夏甸金矿倾斜中厚矿体低贫损分段崩落法研究[D].沈阳:东北大学.
null 朱和玲,2014.松软破碎型复杂矿体开采技术优化与过程控制研究[D].长沙:中南大学.
[1] . Experimental Research on Application of Mixed Aggregate of Mining Waste Rock and Tailings in Downward Layered Approach and Cemented Filling Mining Method HE Jianyuan1,LI Hongye1,GAO Qian2,YIN Shenghua2 [J]. Gold Science and Technology, 2021, 29(4): 564-572.
[2] Xingdong ZHAO,Nan ZENG,Yumin CHEN,Hui WEI,Chenglong WANG,Chenglu HOU,Yunlong DU,Chunchao FAN. Design of the Medium-deep Hole Caving and Subsequent Filling Continuous Mining Technology in Underground Unmanned Mining Area of Sanshandao Gold Mine [J]. Gold Science and Technology, 2021, 29(2): 200-207.
[3] Enxiang SONG, Qiang LI, Jing ZHANG, Kang PENG. Research and Application of Artificial False Bottom in Mining of Orebody in Alteration Zone [J]. Gold Science and Technology, 2019, 27(5): 722-730.
[4] Tianhang ZHANG, Xingdong ZHAO, Huaibin LI, Yifan ZHAO, Shujing ZHANG. Continuous Dry Filling of Long Room Method for Steeply Inclined and Medium Thick Orebody [J]. Gold Science and Technology, 2019, 27(5): 704-711.
[5] MA Minghui,ZHU Mingde,CHEN Zihui,FANG Cheng. Research and Application of Support Technology Without Legs in Sanshandao Gold Mine [J]. Gold Science and Technology, 2017, 25(5): 67-72.
[6] ZHAO Long,WANG Nan,SUN Mingjun. The Optimize Application of Panel Mining Method Second Step in Sanshandao Gold Mine [J]. Gold Science and Technology, 2013, 21(6): 73-77.
[7] WANG Dawei, WANG Zhuo,LI Lei, LI Weining,QIN Weili,LIU Hongwei, LI Weiguo. Research and Application of the Upward Horizontal Fan Drift Mining Method [J]. J4, 2012, 20(2): 67-70.
[8] CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng. Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine [J]. J4, 2012, 20(2): 62-66.
[9] YANG Jiguang. Application of Underhand Drift Bottom Cementing Back -filling Method in Jiaojia Gold Mine [J]. J4, 2011, 19(5): 33-36.
[10] LIU Tao,GAO Longtao,SUI Yongle,SONG Linfu. The Mining Method of Broken Orebody in Hubazhuang Gold Mine,Shandong Province [J]. J4, 2011, 19(5): 29-32.
[11] LU Ren-Jiang, LIU Feng-Jin, LOU Wei-Hua-. Technology Innovation and Application on High Water Consolidation of Fill Mining Method [J]. J4, 2011, 19(1): 51-54.
[12] YANG Yong, CAO Hua-Yong, ZHANG Hai-Chao. Research of the Mining Method of the Broken Orebody on the North Limb of Jiaojia Gold Mine [J]. J4, 2010, 18(2): 51-52.
[13] BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69.
[14] LIU Xiao-Chun, WANG Beng. Overview of the Mining Technological in Sidao Gou Gold Mine [J]. J4, 2005, 13(1-2): 47-50.
[15] HE Zhihong. Prel iminary Probing into the Scheme to Set up the Aggregate-storing Systemof Dry Back-filling Mining Method in Gaoyao Mine Area [J]. J4, 2004, 12(3): 18-21.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] LIU Qing-Guang, GAO Hai-Feng, HUANG Suo-Yang. The Application of PDA in Geology Department of Jiaojia Gold Mine[J]. J4, 2010, 18(3): 79 -82 .
[2] LIU Yu-Meng, LIU Nan, ZHANG Jie, SONG Yu-Bei, GONG Long-Ji, WANG Gang, LIU Xiao, ZHANG Hai-Fang. Study on Structure Characteristics and Ore-prospecting Direction of Yinggezhuang Gold Deposit[J]. J4, 2010, 18(6): 26 -29 .
[3] YI Youchang, MA Cai, LI Yuelong, PAN Tong, LUO Cairang, WANG Chunying. THE PLATE TECTONICS ENVIRONMENT AND METALLOGENESIS WITHIN QINGHAI[J]. J4, 2007, 15(1): 1 -9 .
[4] JIANG Qi, WANG Rong-Chao. [J]. J4, 2010, 18(4): 37 -40 .
[5] YUAN Dong-Cheng, XU Xiao-Feng. [J]. J4, 2010, 18(4): 47 -49 .
[6] CHEN Hua-Dun. [J]. J4, 2010, 18(4): 50 -53 .
[7] QU Hui, SHI Rui-Min. Analysis On Structure Conditions of Dongan Gold Deposit in HeilongjiangProvine[J]. J4, 2007, 15(1): 23 -25 .
[8] HU Qin-Xia, LI Jian-Zhong, YU Guang-Meng, XIE Yan-Fang, ZHANG Ku-Xiao. Discussion on Gold Ore Point of Bailongjiang Metallogenic Belt[J]. J4, 2010, 18(3): 51 -53 .
[9] ZHANG Huaquan,ZHANG Weixin,LI Hongjie. Ore—-formation Conditions and Exploration Orientation of the Gold Deposite in Jiaolai Basin,Shandong Province[J]. J4, 2008, 16(2): 12 -17 .
[10] ZHUANG Yukai,XU Zhongmin,FEN G Jinmin,LU Liangshan,LUAN Zuochun. Acid and Alkali Absorb the Acid Gas in the W et Smelt System[J]. J4, 2008, 16(2): 57 -59 .