青海某金矿选矿厂扩能改造实践

  • 邢晴晴 ,
  • 杨长平 ,
  • 任琪
展开
  • 1.青海省第六地质矿产勘查院,青海  格尔木   816000;
    2.都兰金辉矿业有限公司,青海  格尔木   816000
邢晴晴(1988-),女,福建南平人,助理工程师,从事矿物加工研究工作。ramble77077@sina.com

收稿日期: 2015-06-10

  修回日期: 2015-07-02

  网络出版日期: 2015-11-16

Practice of Capacity Expansion and Remould in a Gold Ore Dressing Plant in Qinghai Province

  • XING Qingqing ,
  • YANG Changping ,
  • REN Qi
Expand
  • 1.The 6th Institute of Qinghai Geology and Mineral Exploration,Golmud   816000,Qinghai,China;
    2.Dulan Jinhui Mining Co.,Ltd.,Golmud    816000,Qinghai,China

Received date: 2015-06-10

  Revised date: 2015-07-02

  Online published: 2015-11-16

摘要

针对青海省某金矿选矿厂存在的部分工艺设备陈旧、设备能耗大以及处理能力低难以匹配采矿能力的问题,对选矿厂进行改扩建。其中,浮选工艺由一粗二精三扫改为二系列作业,流程改为一粗二精二扫,新增溢流型球磨机(MQY3660)作为一段磨矿设备,使用水力旋流器FX500替换原有的螺旋分级机,新增压滤机XMZGFS200/1250-U以满足金精矿压滤要求,新增部分渣浆泵、柱塞泵等辅助设备。改造后选矿厂处理量达到1 500 t/d,年增处理量16余万吨,选矿回收率提高1.54%,年增产金金属量330 kg,年新增利润1 000余万元。

本文引用格式

邢晴晴 , 杨长平 , 任琪 . 青海某金矿选矿厂扩能改造实践[J]. 黄金科学技术, 2015 , 23(4) : 52 -56 . DOI: 10.11872/j.issn.1005-2518.2015.04.052

Abstract

Abstract: According to the existing issues includes part of the old process equipment,high energy consumption of the equipment as well as processing ability that is difficult to match the mining capacity,thus the work about capacity expansion and remolding is carried out.Concretely,for flotation process,a coarse,two fine,three sweep are changed to two series of work,and the process consists of a coarse,two fine,two sweep,and the overflow type ball mill (MQY3660) as a new grinding equipment.In addition,Using hydrocyclone FX500 replaces the original screw pole machine,and new pressurization filter XMZGFS200/1250-U is applied so as to satisfy the requirement of gold concentrate filter,and part of the slurry pump,plunger pump and other auxiliary equipment need to be updated.The results present that handling capacity is up to 1 500 t/d  after remolding of dressing plant,the capacity in a year is more than 160 thousand tons,and annual output of gold metal is around 330 kg,which leads to extra profit about 10 million RMB.

参考文献

[1] 李忠英,肖宏林,南聪平,等.灵湖金矿选矿厂工艺技术改造生产实践[J].黄金,2004,25(11):44-47.                  
[2] 丁文军,樊明玉.某金矿选矿厂工艺设备改造[J].现代矿业,2014,(4):155-158.
[3] 王彦慧,侯金刚,赵健伟.夹皮沟金矿选矿厂技术改造与生产实践[J].黄金,2013,34(4):59-62.
[4] 龚明光. 泡沫浮选[M].北京:冶金工业出版社,2012.
[5] 王虎,刘洋,秦香伟,等.中矿再磨及流程改造提高金精矿品位的实践[J].黄金科学技术,2014,22(6):55-59.
[6] 代岩,刘江峰,朱建鹏.哈西亚图金矿选矿综合回收利用[J].黄金科学技术,2014,22(6):50-54.
[7] 段希祥.破碎与磨矿[M].北京:冶金工业出版社,2006.
[8] 刘志斌,汪勇,高起方.云南某黄金选矿厂工艺技术改造及生产实践[J].黄金,2015,36(1):53-56.
[9] 郑锡联,黄思捷,魏转花.某低品位混合铜矿选矿试验研究[J].黄金科学技术,2013,21(5):97-101.
[10] 宋强. 豫西某金矿选矿工艺技术改造及应用实践[J].陕西冶金,2014,(3):39-41.
[11] 拜鹏程,何烨,胡芳芳,等.磨矿细度和二浸二洗对氰化浸出率影响的试验研究[J].黄金科学技术,2012,20(5):71-73.
[12] 陈丽红,盛艳玲,李和平,等.河西金矿选冶工艺技术改造与生产实践[J].2007,(5):24-27.

文章导航

/