J4 ›› 2001, Vol. 9 ›› Issue (6): 30-35.
• article • Previous Articles Next Articles
CAI Baoqing1,FAN Manhua2
CLC Number:
|
[1] | LIU Chuan. Technical Measures of Raising the Grade of Withdrawal of Ore in Yunxi Mining Area [J]. J4, 2004, 12(3): 28-31. |
[2] | ZHANG Bingxu,HAN Hongjiang. EXPERIMENTAL RESEARCH AND ENGINEERING PRACTICE OF MINING METHOD ABOUT DAZHUANGZI GOLD MINE [J]. J4, 2003, 11(1): 28-32. |
[3] | WANG Chaoyang. THE DISCREPANCY ESTIMATION AND IMPLEMENTATION OF THE LARGE2SCALE MEETING HEAD-ON PROJECT IN LINGLONG GOLD MINE [J]. J4, 2002, 10(4): 17-21. |
[4] | . [J]. J4, 2001, 9(6): 11-14. |
[5] | LI Qiutao,WEI Minghao,LIU Tanzhou,JIANG Yanan,WANG Zhiyuan. Research on Mining Pressure Control Method in Jinqingding Mine [J]. J4, 2011, 19(1): 80-82. |
|