img

Wechat

Adv. Search

J4 ›› 2001, Vol. 9 ›› Issue (6): 30-35.

• article • Previous Articles     Next Articles

COMPRENHENSIVE ASSESSMENTS OF STOPE SUPPORT TECHNIQUES IN GOLD MINE

CAI Baoqing1,FAN Manhua2   

  1. 1.Zhaoqing Gold Company,Guangdong 526000,China;
    2.Hetai Gold Mine of Gaoyao,Guangdong Gaoyao 526127,China
  • Received:2001-08-13 Revised:2001-09-27 Online:2001-12-28 Published:2011-10-31

Abstract:

The support techniques such as belting,wire-rope bolting and guniting ore commonly used under the conditions of bad stability of stope orebody rocks in gold mine for reinforing rocks stability,quarranting working safety,mining depletion and dilution to raise economic effect.In this paper,they are summarily introduced and assessed.

Key words: gold mine, deposit mining, stope support, bolt, wire rope bolt

CLC Number: 

  • TD863


[1] 陈友东,贺志宏.河台金矿水泥砂浆锚杆固帮的应用分析
[J].南方钢铁,1999,(108):16-19.

[2] 王立君,姚香.摩擦锚杆在采场支护中的运用
[J].黄金,2000,21(3):24-27.

[3] 胡洪森.黑龙江老柞山金矿东采区采场支护设计与应用
[J].黄金,2000,21(2):23-25.

[4] 王文才.采场顶板长锚索预锚固技术的研究与应用
[J].黄金,2001,22(3):22-24.

[1] LIU Chuan. Technical Measures of Raising the Grade of Withdrawal of Ore in Yunxi Mining Area [J]. J4, 2004, 12(3): 28-31.
[2] ZHANG Bingxu,HAN Hongjiang. EXPERIMENTAL RESEARCH AND ENGINEERING PRACTICE OF MINING METHOD ABOUT DAZHUANGZI GOLD MINE [J]. J4, 2003, 11(1): 28-32.
[3] WANG Chaoyang. THE DISCREPANCY ESTIMATION AND IMPLEMENTATION OF THE LARGE2SCALE MEETING HEAD-ON PROJECT IN LINGLONG GOLD MINE [J]. J4, 2002, 10(4): 17-21.
[4] . [J]. J4, 2001, 9(6): 11-14.
[5] LI Qiutao,WEI Minghao,LIU Tanzhou,JIANG Yanan,WANG Zhiyuan. Research on Mining Pressure Control Method in Jinqingding Mine [J]. J4, 2011, 19(1): 80-82.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!