Wechat
J4 ›› 2004, Vol. 12 ›› Issue (1): 44-46.
• article • Previous Articles
LU Huijun
Received:
Revised:
Online:
Published:
Abstract:
Based on the drawings generated by Geology-Survey-Mining Management Information System which is co-developed by Hetai Gold Mine and Northeastern University,through daily work such as ore body determining,subleveldesign,gallery design etc.,the paper introduces the bringing advantages,conveniences,high efficiency and high precision that applying AutoCAD to daily geologic work.
Key words: AutoCAD, Mine geology, Application, High efficiency, High precision
CLC Number:
LU Huijun. The Application of AutoCAD in Mine Geologic Work[J].J4, 2004, 12(1): 44-46.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2004/V12/I1/44
Cited