img

Wechat

Adv. Search

Gold Science and Technology ›› 2017, Vol. 25 ›› Issue (4): 87-92.doi: 10.11872/j.issn.1005-2518.2017.04.087

Previous Articles     Next Articles

Complex Blasting Network Detonation Simulation and Effect Prediction for Open Pit Mine

LI Jinling,WANG Liguan,CHEN Xin   

  1. 1.School of Resources and Safety Engineering,Central South University,Changsha    410083,Hunan,China;
    2.Research Center of Digital Mine,Central South University,Changsha    410083,Hunan,China
  • Received:2016-05-19 Revised:2016-06-14 Online:2017-08-30 Published:2017-10-30

Abstract:

Abstract: Complex blasting network design of open-pit mine needs to consider parameters of blasthole network,connection mode,specific charge,millisecond delay of detonator and so on,which brings difficulties and challenges to design and optimization of blasting.In order to solve complex blasting network quickly and accurately,the data structure of blasthole and nonel tube were defined.Furthermore,breadth-first synchronous search(BFSS) algorithm was proposed,which implemented to the blasting network effectively.Meanwhile,the ignite time and the detonation time of detonator were acquired.Then,blasting effect such as detonate simulation,burning front and detonating isochrones could be analyzed,which provided an important theoretical basis for design and optimization of blasting network.

Key words: open pit bench, blasting network, BFSS algorithm, burning front, isochrones, detonation simulation

CLC Number: 

  • TD672 

[1] Bai Runcai,Deng Chao,Liu Guangwei.3D visualization system of  blasting design of open-pit mine[J].Metal Mine,2014(9):116-120.[白润才,邓超,刘光伟.露天矿爆破设计三维可视化系统[J].金属矿山,2014(9):116-120.]
[2] Hu Guiru.Research of open-pit bench blasting of CAD development model[J].Nonferrous Metals(Mining Section),2010(3):61-63.[胡贵如.露天台阶爆破CAD开发模型的研究[J].有色金属(矿山部分),2010(3):61-63.]
[3] Liu Qian,Lv Shuran.Research on the millisecond delay interval time of open-pit bench blasting[J].Engineering Blasting,2014(1):55-59.[刘倩,吕淑然.露天台阶爆破毫秒延时间隔时间研究[J].工程爆破,2014(1):55-59.]
[4] Favreau P,Andrieux P.BLASTCAD-Noranda’s three dimen- sional computer-aided underground blast design system[J].Computer Application,1993,86(967):62-69.
[5] Smith M,Hautala R L.A coupled expert system approach to optimal blast design[J].Proceeding International Symposium on Mine Planning and Equipment Selection,1990:481-487.
[6] Zhou Lei.Research of Evaluation of Bench Blasting Effect and Blasting Parameters Optimization[D].Wuhan:Wuhan Univer- sity of Technology,2012:8-14.[周磊.台阶爆破效果评价及爆破参数优化研究[D].武汉:武汉理工大学,2012:8-14.]
[7] Fu Hongxian,Li Kemin.Analysis of high bench castblasting parameters in surface coal mines[J].Journal of China Coal Society,2006(4):442-447.[傅洪贤,李克民.露天煤矿高台阶抛掷爆破参数分析[J].煤炭学报,2006(4):442-447.]
[8] Qu Shijie,Pang Yongjun,Shang Fenghua,et al.Geological and topographic data base of Shuichang iron mine and its application in blasting design[J].Metal Mine,2001(2):12-15.[璩世杰,庞永军,尚峰华,等.水厂铁矿地质地形数据库及其在爆破设计中的应用[J].金属矿山,2001(2):12-15.]
[9] Chen Yajun,Wu Zhichao.Analysis of safe initiation network for large space blasting in open pit mine[J].China Coal,2011,37(4):102-104.[陈亚军,吴志潮.露天矿大区爆破安全起爆网路分析[J].中国煤炭,2011,37(4):102-104.]
[10] Li Shunbo,Yang Jun,Li Changjun.Control of blasting vib- ration in foundation pit excavation based on the precise time delay[J].Explosive Materials,2015,44(6):9-14.[李顺波,杨军,李长军.基于精确延时的基坑开挖爆破振动控制研究[J].爆破器材,2015,44(6):9-14.]
[11]  Li Guanghua.Standardization technology research on surface network of medium length hole blasting and millisecond delay[J].Bengang Technology,2014(5):1-6.[李光华.中深孔爆破地表网络及毫秒延时标准化技术研究[J].本钢技术,2014(5):1-6.]
[12] Zhu Liangfeng,Wu Xincai,Liu Xiuguo,et al.Introduction and implementation of virtual borehole in the construction of urban 3D strata model[J].Geography and Geo-Information Science,2004,20(6):26-30,43.[朱良峰,吴信才,刘修国,等.城市三维地层建模中虚拟孔的引入与实现[J].地理与地理信息科学,2004,20(6):26-30,43.]
[13] Cheng Ping.Burning front of initiating system design[J].Metal Mine,2008(11):31-33.[程平.爆破起爆网络设计中的点燃阵面[J].金属矿山,2008(11):31-33.]
[14] He Yakun,Ai Tinghua,Yu Wenhao.Accessibility analysis of road network supported by isochrone model[J].Acta Geodaetica et Cartographica Sinica,2014,43(11):1190- 1196.[何亚坤,艾廷华,禹文豪.等时线模型支持下的路网可达性分析[J].测绘学报,2014,43(11):1190-1196.]
[15] Zhang Haibo,Zhang Xiaoyun,Tao Wenwei.A breadth-first search based service restoration algorithm for distribution network[J].Power System Technology,2010,34(7):103- 108.[张海波,张晓云,陶文伟.基于广度优先搜索的配电网故障恢复算法[J].电网技术,2010,34(7):103-108.]
[16] Bi Lin.Study of Key Technology of Platform of Digital Mining Software System[D].Changsha:Central South University,2010:38-54.[毕林.数字采矿软件平台关键技术研究[D].长沙:中南大学,2010:38-54.]

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!