面向多装备短间隔接续的地下黄金矿调度优化研究
王浩, 弯茂全, 龚韩君, 李国清, 侯杰, 胡乃联
Research on Scheduling Optimization of Underground Gold Mines for Multi-Equipment and Short Interval Continuity
Hao WANG, Maoquan WAN, Hanjun GONG, Guoqing LI, Jie HOU, Nailian HU
黄金科学技术
.
2025, (2): 369
-386
.
DOI: 10.11872/j.issn.1005-2518.2025.02.254