[1] 王文龙.钻眼爆破[M].北京:煤炭工业出版社,1984.
Wang Wenlong.Drilling and Blasting[M].Beijing:Coal Industry Press,1984.
[2] 刘优平,黎剑华,林大能,等.掏槽爆破中空孔效应的理论与试验研究[J].矿业研究与开发,2007,27(5):75-77.
Liu Youping,Li Jianhua,Lin Daneng,et al.Theoretical and experimental study on effects of empty hole in cut blasting[J].Mining Research and Development,2007,27(5):75-77.
[3] 刘优平,周正义,黎剑华.井巷掏槽爆破中空孔效应的理论与试验分析[J].金属矿山,2007(2):12-14.
Liu Youping,Zhou Zhengyi,Li Jianhua.Theoretical and experimental study on empty hole effect in tunnel cut blasting[J].Metal Mine,2007(2):12-14.
[4] 李夕兵.凿岩爆破工程[M].长沙:中南大学出版社,2011.
Li Xibing.Drilling and Blasting Engineering[M].Changsha:Central South University Press,2011.
[5] 黄宝龙.准直孔掏槽爆破技术在正兴矿的应用[J].中国矿业,2016,25(1):101-102.
Huang Baolong.Application of technique of quasi-parallel cutting blasting in Zhengxing coal mine[J].China Mining Magazine,2016,25(1):101-102.
[6] 东兆星,李佃平,李正龙,等.隧道掘进常用掏槽方式及参数合理性评价与分析[J].岩石力学与工程学报,2003,22(9):1478-1482.
Dong Zhaoxing,Li Dianping,Li Zhenglong,et al.Evaluation and analysis on the rationality of undermine patterns and parameters for tunneling[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(9):1478-1482.
[7] 单仁亮,黄宝龙,高文蛟,等.岩巷掘进准直眼掏槽爆破新技术应用实例分析[J].岩石力学与工程学报,2011,30(2):224-232.
Shan Renliang,Huang Baolong,Gao Wenjiao,et al.Case studies of new technology application of quasi-parallel cut blasting in rock roadway drivage[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(2):224-232.
[8] 单仁亮,黄宝龙,蔚振廷,等.岩巷掘进准直眼掏槽爆破模型试验研究[J].岩石力学与工程学报,2012,31(2):256-264.
Shan Renliang,Huang Baolong,Wei Zhenting,et al.Model test of quasi-parallel cut blasting in rock drivage[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(2):256-264.
[9] 孙龙华,杨双锁,李达昌,等.石灰岩平巷合理掏槽方法和爆破参数的研究[J].金属矿山,2013(9):26-29.
Sun Longhua,Yang Shuangsuo,Li Dachang,et al.Research of the reasonable cutting method and blasting parameter in limestone drift excavation[J].Metal Mine,2013(9):26-29.
[10] 傅菊根,徐颖,郝飞,等.硬岩巷道掘进的中深孔爆破试验研究[J].安徽理工大学学报(自然科学版),2004,24(4):24-27.
Fu Jugen,Xu Ying,Hao Fei,et al.Middle-deep bore blasting experimental study on hard rock tunnel heading[J].Journal of Anhui University of Science and Technology(Natural Science),2004,24(4):24-27.
[11] 陈士海,魏海霞,薛爱芝.坚硬岩石巷道中深孔掏槽爆破试验研究[J].岩石力学与工程学报,2007,26(增1):3498-3502.
Chen Shihai,Wei Haixia,Xue Aizhi.Testing study on middle deep cut-hole blasting in hard rock tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):3498-3502.
[12] 雷永健,周传波,饶学治.合理掏槽方法和爆破参数提高平巷掘进爆破率的实践[J].工程爆破,2006,12(1):71-74.
Lei Yongjian,Zhou Chuanbo,Rao Xuezhi.Practice on improvement of blasting efficiency in drift excavation with reasonable cut method and blasting parameter[J].Engineering Blasting,2006,12(1):71-74.
[13] 余永强,王超,褚怀保,等.硬岩巷道中深孔爆破掘进复楔形掏槽试验研究[J].爆破,2013,30(2):95-99.
Yu Yongqiang,Wang Chao,Chu Huaibao,et al.Duplex wedge cutting on mid-depth borehole tunneling blasting in hard rock[J].Blasting,2013,30(2):95-99.
[14] 周传波,谷任国,罗学东.坚硬岩石一次爆破成井掏槽方式的数值模拟研究[J].岩石力学与工程学报,2005,24(13):2298-2303.
Zhou Chuanbo,Gu Renguo,Luo Xuedong.Numerical simulation on cutting mode of shaft excavation by one-step deep-hole blasting in hard rock[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(13):2298-2303.
[15] 郑祥滨,璩世杰,范利华,等.单螺旋空孔直眼掏槽成腔过程数值模拟研究[J].岩土力学,2008,29(9):2589-2594.
Zheng Xiangbin,Qu Shijie,Fan Lihua,et al.Numerical simulation of cavity formation process by single helix parallel hole cut blasting[J].Rock and Soil Mechanics,2008,29(9):2589-2594.
[16] 李启月,李夕兵,范作鹏,等.深孔爆破一次成井技术与应用实例分析[J].岩石力学与工程学报,2013,32(4):664-670.
Li Qiyue,Li Xibing,Fan Zuopeng,et al.One time deep hole raise blasting technology and study[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(4):664-670.
[17] 范兴俊,陈斌,夏军,等.中部间隔装药直眼掏槽爆破成腔过程数值模拟[J].矿业研究与开发,2016,36(9):88-92.
Fan Xingjun,Chen Bin,Xia Jun,et al.Numerical simulation on the cavity formation in parallel cut blasting with interval charge at the middle part of hole[J].Mining Research and Development,2016,36(9):88-92.
[18] Geglio M.Spherical vessel subjected to explosive detonation loading[J].International Journal of Pressure Vessel & Piping,1997,74(2):83-88.
[19] 时党勇.基于ANSYS/LS-DYNA 8.1进行显式动力分析[M].北京:清华大学出版社,2005.
Shi Dangyong.Explicit Dynamic Analysis Based on ANSYS/LS-DYNA 8.1[M].Beijing:Tsinghua University Press,2005.
[20] 赵国彦,赵井清,李启月.9孔桶形掏槽一次成井技术[J].科技导报,2013,31(16):21-25.
Zhao Guoyan,Zhao Jingqing,Li Qiyue.Nine-hole parallel cutting technology of the shaft excavation in one-step[J].Science and Technology Review,2013,31(16):21-25.
[21] 尚晓江,苏建宇,王化锋.ANSYS/LS-DYNA动力分析方法与工程实例[M]. 北京:中国水利水电出版社,2008.
Shang Xiaojiang,Su Jianyu,Wang Huafeng.ANSYS/LS-DYNA Dynamic Analysis Method and Engineering Example[M].Beijing:China Water and Power Press,2008.