收稿日期: 2016-09-29
修回日期: 2016-12-05
网络出版日期: 2018-05-19
基金资助
基金项目:国家自然科学基金项目“基于深度学习和距离场的复杂金属矿体三维建模技术研究”(编号:41572317)资助
Study on Multi Objective Optimization and Application of Medium and Long Term Plan for Underground Mine
Received date: 2016-09-29
Revised date: 2016-12-05
Online published: 2018-05-19
刘定一 , 王李管 , 陈鑫 , 钟德云 , 徐志强 . 地下矿中长期计划多目标优化及应用研究[J]. 黄金科学技术, 2018 , 26(2) : 228 -233 . DOI: 10.11872/j.issn.1005-2518.2018.02.228
Aiming at the problem that the traditional manual weaving for making underground mine production plan is complicated and the charts are difficult to display,based on the theory and method of multi-objective programming,a multi-objective programming model is established taking net present value,grade and metal quantity for goal,a feasible production plan is solved quickly and accurately,which avoids the limitation of ordinary linear programming,3D visualization technology is used to clearly show the spatial distribution of underground engineering and their logical relationship.A set of feasible production planning process is provided, which simplifies the work of production technology.It is proved by an example of one iron mine that the method can effectively optimize the production plan of the mine and provide the basis for mine operation and decision-making.
[1] 李英龙,童光煦.矿山生产计划编制方法的发展概况[J].金属矿山,1994,23(12):11-16.
Li Yinglong,Tong Guangxu.Survey of the development of mine production plan scheduling[J].Metal Mine,1994,23(12):11-16.
[2] Nehring M,Topal E,Kizil M,et al.Integrated short- and medium-term underground mine production scheduling[J].Journal- South African Institute of Mining and Metallurgy,2012,112(5):365-378.
[3] O’Sullivan D,Newman A.Optimization-based heuristics for underground mine scheduling[J].European Journal of Operational Research,2015,241(1):248-259.
[4] 黄启富,陈建宏.基于多轮PSO算法的中长期动态优化配矿研究[J].计算机应用研究,2010,27(10):3711-3717.
Huang Qifu,Chen Jianhong.Research on middle and long-term optimization of mine ore blending based on multi round PSO algorithm[J].Application Research of Computers,2010,27(10):3711-3717.
[5] 姚旭龙,胡乃联,周立辉,等.基于免疫克隆选择优化算法的地下矿山配矿[J].北京科技大学学报,2011,33(5):526-531.
Yao Xulong,Hu Nailian,Zhou Lihui,et al.Ore blending of underground mines based on an immune clone selection optimization algorithm[J].Journal of University of Science & Technology Beijing,2011,33(5):526-531.
[6] 侯杰,胡乃联,李国清,等.多金属地下矿山生产计划动态优化[J].工程科学学报,2016,38(4):453-460.
Hou Jie,Hu Nailian,Li Guoqing,et al.Dynamic optimization of production plans for multi-metal underground mines[J].Chinese Journal of Engineering,2016,38(4):453-460.
[7] 周科平,古德生.遗传算法优化地下矿山开采顺序的应用研究[J].中国矿业,2001,10(5):50-54.
Zhou Keping,Gu Desheng.Optimization of stoping sequence in underground mine by using genetic algorithm method[J].China Mining Magazine,2001,10(5):50-54.
[8] 蒋京名.DIMINE三维可视化软件在大红山铜矿生产计划编制中的应用研究[D].长沙: 中南大学,2010.
Jiang Jingming.Application Study of Dahongshan Copper Mine for Production Planning based on DIMINE Three-dimensional Visualization Software[D].Changsha:Central South University,2010.
[9] 冯武.北洺河铁矿三维可视化采矿设计流程再造与生产计划编制优化研究[D].长沙:中南大学,2014.
Feng Wu.A Study on Reengineering of Mining Design Process and Optimization of Production Planning in Beiminghe Iron mine with 3D Visualization Technology[D].Changsha:Central South University,2014.
[10] 胡柳青,王李管,毕林.地下矿山生产计划3D可视化编制技术[J].煤炭学报,2007,32(9):930-933.
Hu Liuqing,Wang Liguan,Bi Lin.3D visualization system based production plan scheduling of underground mine[J].Journal of China Coal Society,2007,32(9):930-933.
[11] 刘三明.多目标规划的若干理论和方法[D].大连: 大连理工大学,2006.
Liu SanMing.Some Theories and Methods for Multi Objective Programming Problems[D].Dalian:Dalian University of Technology,2006.
/
〈 | 〉 |