img

QQ群聊

img

官方微信

  • CN 62-1112/TF 
  • ISSN 1005-2518 
  • 创刊于1988年
高级检索
采选技术与矿山管理

基于特征值域的可拓学理论的工程岩体质量评价

  • 吴肖坤 ,
  • 刘敦文 ,
  • 江帆 ,
  • 唐洋 ,
  • 杨光 ,
  • 杨晨
展开
  • 1.中南大学资源与安全工程学院,湖南  长沙   410083;
    2.中交路桥华南工程有限公司,广东  中山   528403
吴肖坤(1989-),男,安徽宿州人,硕士研究生,从事隧道、采防及安全技术研究工作。wuxiaokunsh@126.com

收稿日期: 2014-11-10

  修回日期: 2015-01-22

  网络出版日期: 2015-08-06

基金资助

国家自然科学基金重大项目“深部多相多场耦合作用及其灾害发生机理与防治”(编号:50490274)与湖南省自然科学基金项目“隔水层劣化过程探测与突水灾害控制研究”(编号:06JJ3030)联合资助

Extension Theory of Engineering Rock Mass Quality Evaluation based on the Feature Range

  • WU Xiaokun ,
  • LIU Dunwen ,
  • JIANG Fan ,
  • TANG Yang ,
  • YANG Guang ,
  • YANG Chen
Expand
  • 1.School of Resources and Safety Engineering,Central South University,Changsha   410083,Hunan,China;
    2.Road and Birdge South China Engineering Co., Ltd.,Zhongshan   528403,Guangdong,China

Received date: 2014-11-10

  Revised date: 2015-01-22

  Online published: 2015-08-06

摘要

为了得到更为准确的岩体质量评价结果,基于可拓学工程方法,在物元模型理论基础上建立工程岩体质量评价的物元模型。对待评物元的各因素特征赋予切合实际的值域,建立区间与区间的距的计算公式,应用可拓集合的关联函数,建立基于物元和关联函数的工程岩体可拓评价方法。对某矿山主要工程岩体质量进行了评价,得到岩体N1的质量等级为Ⅰ级,岩体N2、N3、N4和N5的质量等级为Ⅱ级,岩体N6的质量等级为Ⅲ级。通过与基于特征值的可拓学理论以及其他岩体质量评价方法所得到的岩体质量评价结果进行比较,验证了基于特征值域的可拓学理论在工程岩体质量评价中的可行性和可靠性。

本文引用格式

吴肖坤 , 刘敦文 , 江帆 , 唐洋 , 杨光 , 杨晨 . 基于特征值域的可拓学理论的工程岩体质量评价[J]. 黄金科学技术, 2015 , 23(2) : 68 -75 . DOI: 10.11872/j.issn.1005-2518.2015.02.068

Abstract

In order to obtain more accurate results of rock mass quality evaluation based on extenics engineering method,we established the matter-element model of rock quality evaluation based on the theory of matter-element model.With a review of the various factors of the matter-element of feature given practical domain,calculation formula of interval distance was established as well,and finally we applied extension set correlation functions to establish evaluation method of engineering rock mass based on the content and links function extension.Main engineering rock mass quality of the iron ore was valuated,and the results demonstrated that the rock quality level of N1 belonged toⅠ,while N2,N3 ,N4 as well as N5 were all Ⅱ,and N6 belonged to Ⅲ.Through comparing the results of extension theory and quality evaluation of rock mass obtained by other evaluation,we verified the feasibility and reliability of engineering rock mass quality evaluation method based on feature range.

文章导航

/