QQ群聊
官方微信
J4 ›› 2007, Vol. 15 ›› Issue (1): 45-47.
• 矿产勘查 • 上一篇 下一篇
陈宏兵, 柳华杰
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
CHEN Hong-Bing, LIU Hua-Jie
Received:
Revised:
Online:
Published:
摘要:
在软弱夹层、蚀变带、破碎带等软岩中掘进巷道,往往由于支护方式选择不合理,而造成巷道多次破坏,多次支护,既耽误工期,又容易造成损失。为解决这个问题,通过对不稳固巷道的维修原理进行分析,总结出适合这类巷道的支护方法,以确保工程安全顺利进行。
关键词: 不稳固巷道, 多次破坏, 维护原理, 支护方法
Abstract:
Destroying and timbering for times is always caused because of choosing of unreasonable timbering methods when we dig drifts in soft rocks such as weak-interbedded stratums atteration bands, or crushed zones. To settle such a problem, We summarized timbering methods suitable for such drifts by ensure projects can be carried through safely and smoothly.
Key words: Unstable drift, destroying for times, maintance principium, timbering method
中图分类号:
陈宏兵, 柳华杰. 不稳固巷道的维护原理与支护方法的探讨[J]. J4, 2007, 15(1): 45-47.
CHEN Hong-Bing, LIU Hua-Jie. Discussing of Maintance Principium and Timbering Methods in Unstable Drifts[J]. J4, 2007, 15(1): 45-47.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.goldsci.ac.cn/CN/
http://www.goldsci.ac.cn/CN/Y2007/V15/I1/45
[1] 朱志澄,宋江鸥.构造地质学[M].武汉:中国地质大学出版社,1990. [2] 解世俊.金属矿产地下开采[M].北京:冶金,1990.
Cited