img

QQ群聊

img

官方微信

高级检索

J4 ›› 2005, Vol. 13 ›› Issue (6): 35-38.

• 矿产勘查 • 上一篇    下一篇

大水矿区堵水方法及其应用结果

朱志彬, 王平,刘晓春   

  1. 湖北三鑫金铜股份有限公司,湖北  大冶, 435100
  • 收稿日期:2004-10-12 修回日期:2004-11-10 出版日期:2005-12-30 发布日期:2011-11-09
  • 作者简介:朱志彬(1972-),男,工程师,从事矿山采矿技术工作.

Build Up Water Method In Inundation Mine Area And Effect of Application

ZHU Zhiben,WANG Ping, LIU Xiaochun   

  1. Hubei Sanxin Gold-Copper lim ited liability company, Hubei Dayeshi 435100, China
  • Received:2004-10-12 Revised:2004-11-10 Online:2005-12-30 Published:2011-11-09

摘要:

主要根据五龙金矿裂隙涌水量大及排水费用占采矿成本1/3的实际情况,介绍历年应用过的堵水方法及评价其应用结果。

关键词: 岩金矿山, 大水矿区, 堵水方法, 应用结果

Abstract:

build up water method that applicated over the years was introduced in this arctice and application consequence was evaluated, according to crack gushingwarte large and drain expense accountmining costing one third.

Key words: rock gold mine, inundation mine area, build up watermethod, application consequence

中图分类号: 

  • TD743


[1] 采矿手册编委会. 采矿手册(第6卷)
[M]. 北京:冶金工业出版社, 1991.

[2] 中国黄金生产实用技术编委会. 中国黄金生产实用技术
[M]. 北京:冶金工业出版社, 1998.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!