竖井水仓的设计与施工若干技术问题探讨

何建华   

  1. 广东高要河台金矿,广东 高要 526127
  • 收稿日期:2003-10-23 修回日期:2003-12-04 出版日期:2004-02-28 发布日期:2011-09-15
  • 作者简介:何建华(1973-),男,助理工程师,从事岩金矿山采矿技术和管理工作.

Approach Some Technology Problems Encountering in the Design and Operation of Shaft's Sump

HE Jianhua   

  1. Hetai Gold Mine,Guangdong Gaoyao 526127,China
  • Received:2003-10-23 Revised:2003-12-04 Online:2004-02-28 Published:2011-09-15

摘要:

竖井水仓根据矿山不同含水岩层性质与涌水量,以及正常排水能力和排水时间确定。水仓与水泵、变电硐室应紧密相连,以减少开拓工程量,并应根据矿山开采方法是否需要排泥而按有关规定施工。

关键词: 水仓, 设计规定, 涌水量计算, 施工技术

Abstract:

The shaft's sump can be used as reserve water、form a sediment and clear up.According to mine's different characters of water-bearing、pouring out water volume,as well as normal displacement and drainage time to decide the sump's volume.In order to reduce mining engineering amount,we should abide by connected operation regulations,on the basis of mine's extraction and whether need to drain mud.

Key words: Sump, Designed regulation, Account of pouring out water volume, Operation technology

中图分类号: 

  • TD853.11

[1]  采矿设计手册编委会.采矿设计手册(井巷工程卷)[M].北京:中国建筑工业出版社,1989.
[2]  采矿设计手册编委会.采矿设计手册(矿产地质卷下)[M].北京:中国建筑工业出版社,1989.
[3]  矿山地质手册编委会.矿山地质手册[M].北京:冶金工业出版社,1995.

[1] 高光. 盲竖井井位选择的可行性研究[J]. J4, 2006, 14(5): 34-37.
[2] 郭强军. 盲竖井定向测量[J]. J4, 2004, 12(3): 46-48.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!