ISSN 1005-2518
CN 62-1112/TF
Home Table of Contents

20 April 2005, Volume 13 Issue 1-2
    

  • Select all
    |
    article
  • ZHANG Jianbin , ZHU Zhixiang
    J4. 2005, 13(1-2): 2-5.
    Abstract ( )   Knowledge map   Save

    Magma rock are closely related with mineralization rule, Magma rock category in jiguanzui copper - gold deposit is numerous and have a characteristics of many periods and times, the deposit which mineralized is very comp licated. The article expatiates the correlation of both from different side, arguements the order of magma rock intrusiveness, fore investigative foundation in person last, further enrich and develop the cognition of the magma rock and mineralization rule, and have the important leadingmeaning to the geology work in the future.

  • CAO Zhong, YE Hui, YANG Zhongqian
    J4. 2005, 13(1-2): 6-9.
    Abstract ( )   Knowledge map   Save

    Th is text according to data and the experience in m any years, researches and analyzes stratum, structure, magm a rock, wall rock eclipse and the source of m ineralize materia l, m igration and aggradation of them ineral liquid in the taohuazhui copper& go ld& ironm ine bed, , and as to discusses method of  the m ineralization , the mineral bed cause of  formation.

  • GAO YuLiang,LIU Chengping,WANG Junyun
    J4. 2005, 13(1-2): 10-15.
    Abstract ( )   Knowledge map   Save

    From 1988,Now J i Guan Zui and Tao Hua Zui mine bed develop s 600m deep ly, long about 1000m, 500m of breadth south to north, add up to 11 layer, although once took p lace the water and mire dash forward of kaste in early days, later hydrology relation became faintly of mineral and rock, so take p lace natural water and mire dash forward of kaste impossibility, The paper discusses the new understanding of the mine bed hydrology geology.

  • YE Hui, WU Ddelin
    J4. 2005, 13(1-2): 16-20.
    Abstract ( )   Knowledge map   Save

    Th is text puts forw ard the duplex construct- the duplex syncline controls the m ineral principle, analyzing the mainmechanism of  the structure to contro l them inera,l building up Jiguan zui copper-gold mine bed  mineral bodies controls and permits the motive of  the mineralizing mode and new principle of ore prospecting.

  • WANG Jia-Ji, GUO Guo-Ting, MA Ban
    J4. 2005, 13(1-2): 21-24.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    This text analyses and compares 3 kinds of  the stereoscopic diagraph method of goaf,recommend using laserm easure system to underground mine according to our company actual c ircumstance.

  • TAN Hua-Jun, TUN Tian-Qiu
    J4. 2005, 13(1-2): 25-29.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    stope measurem ethodmany and varied, purpose generally with simple, fastthe little and accurate rate of work load . This article summarizes and appra ises measuremethod and put forward a kind of a stopem easure method-shoot line method

  • MA Bin, LEI Bin, TAN Xuejun
    J4. 2005, 13(1-2): 30-33.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    theWGL-1medium depth bore obliqu ity surveymeteris app lied in them ineralm easure,its function, accuracy, w ork efficiency, function etc. are all fulfilled the request o f produce actual,and suits very much check and acceptance  with the undergroundm edium depth bore measure.

  • CHEN Hu ix iang, YAN Tao, LUOW anchuan
    J4. 2005, 13(1-2): 34-35.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    Carry on lead transfer through the diagonal linem ethod, no t only solved basically impersonal condition limit of the traditional triangle connection survey the method reques,t but also enhanced the engineering lead accuracy and measure the work efficiency.

  • WANG Xin-Zhong, CHEN Qing-Quan
    J4. 2005, 13(1-2): 36-39.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    mine loss and dilut ion is a importance guideline appraising technology manage level and mining method.little experience and advice for reduce mine loss and dilution was summarized to reference for co- worker in Hubei Sanxin Gold- Copper limited liability company.

  • CHEN Qing-Quan, LIU Dang-Quan
    J4. 2005, 13(1-2): 40-43.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    in view of occurrence regularity or specification in # deposit of  jiguanzui  mining area,sorts of  filled stopes has definnite speed assignment in mine production, but some quenstion need to settle in pillar stoping step by step。

  • HUANG Jiu-Min, SUN Ceng-Feng, GENG Lin-Ke
    J4. 2005, 13(1-2): 44-46.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    lots of character isic and quenstion of shrinkage stoping as prim ary stop ing in hua chang gou gold mine was introduced, such as reduce mine loss # dilution , ribpillar stoping, settle void.Steeply dipping narrow depositsw as stoped in the conditions of  steady ore- rock, but partial unsteady becase split  and jointed development.

  • LIU Xiao-Chun, WANG Beng
    J4. 2005, 13(1-2): 47-50.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    the experience and lesson of po ly technicalm in ingm ethod comprehensive and nimble application over the years are summarized in order to deal with the characteristics of complex deposits,occurrence conditions in this articles, The improvement advice to next step is pointed out.

  • TIAN Bei, LI Dian-Hui
    J4. 2005, 13(1-2): 51-54.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    With regard to how ameliorate the strength of back- filling materials o f ta iling- cementation, some suggestions are summarized in this paper

  • GAO Qing-Zhou, HOU Rui-Qin
    J4. 2005, 13(1-2): 55-57.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    accord ing to mine specification of deposits and mine devolop circumstance and in view of natura l resources lack product ion actuality, poly technical mining method was applied to satisfy mine production need by fast mining and fast  come out some characterisic of stoping was summaried in
    this arctice in jiu dian gold mine.

  • LIU Dang-Quan, SUN Ceng-Feng
    J4. 2005, 13(1-2): 58-62.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    through introducing of cav ing recover the pillar o f sub level drilling stage room stoping in Ti Bai  Gold Mine, caving apply characterisic and quenst ion existin the process of  recover wide pillar was pointed out measure o f  improve recover rate through intensify draw managing was put  forward。

  • ZHANG Bin-Zhou, GAO Qing-Zhou, SHANG Guan-Kuan-Beng
    J4. 2005, 13(1-2): 63-66.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    Several characterisic of construction in inprimary well extend engineering was introduced in this arctice in Hubei Sanxin Gold-Copper limited liability company, the importance of improve guage precision was emphasized in the process of primary well extend engineering.

  • SHANG Guan-Kuan-Beng, ZHANG Bin-Zhou
    J4. 2005, 13(1-2): 67-69.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    Adop tingmiddling deep hole scanty contrast blast form incise courtyard once, to accelerate mining intension , to assure normal production safety.

  • LI Ming-Shui, ZHANG Zhong-Hua, DENG Ge-Han
    J4. 2005, 13(1-2): 70-72.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    The frame and work principle of import ceramics filter, outer-filter style and inner-filter style with circle canister vacuum was introduced, it’s using condition , using effect and bring economy benefit was compared.

  • LIU Heng-Bai, ZHANG Zhong-Hua, HU Zhong-Zhu, LI Ming-Shui, YI Zhi
    J4. 2005, 13(1-2): 71-72.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    Through the flow inspection and the analysis, increases the original rubbing craft a section of closed circuit grindings flow to change section of rubbings, the sorting machineoverflow enters the cyclone graduation rubbing once flow; The flotation flow by orig inalmixes partially elects one
    thick one sweep one fine changes two thick, one rough and stra ightforw ardmeets delivers them ixore concentrate, three sweeps, an essence, makes the golden returns- rat io to enhance 4% , the copper returns- ratio enhances 3%, the benefit is extremely considerable.

  • DAN Ji-Jun, DENG Ge-Han
    J4. 2005, 13(1-2): 76-79.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    TheHP300 circular cone breaker imports the equipment,compares with the domestically produced PYB1750 circular cone breaker, broken granularity even, installment service convenient,the spare parts spare parts are few, may realize the automat icclear cavity, and has the good hard protection funct ion; Deficiency, equipment disposable investment big, the spare parts cost is high.

  • ZHANG Zhong-Hua, ZHANG Jun-Yan
    J4. 2005, 13(1-2): 80-83.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    The frame and work principle of import ceramics filter, outer-filter style and inner-filter style with circle canister vacuum was introduced, it’s using condition, using effect and bring economy benefit was compared.

  • ZHANG Jun-Yan, LIU Dang-Quan
    J4. 2005, 13(1-2): 84-87.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    Pass the applied present condition that introduce the scraperw inches in ta ibaim ineral collapse fell method adoptaly, point out its in applied process of many advantages, and in practic center backlog plentifulness experience, from but made rake m ineral winch in the go ld m ineral mounta in production line applied more extensive with perfect.

  • CHEN Dong-Zhi, LI Jin-Jun
    J4. 2005, 13(1-2): 88-90.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    the abstract, concentrates the atomic absorption law analysis in the foam plastics tomeasure the earnest money in the practical application, carries on the bene ficial discussion to this analysis determ ination method certa intechnical questions.

  • HU Xiang-Dong, DUAN Shi-Shan
    J4. 2005, 13(1-2): 91-96.
    Abstract ( ) Download PDF ( )   Knowledge map   Save

    In view of instances that ventilation system can't satisfy mine produce need and ventilation disorder sorts of plan intechnical reform was pointed out and superior selective, it improve work condition now and supply a good surrounding for far development in mine in carryout.