Study on the Optimization of Structural Parameters of Sublevel Open Stopping with Subsequent Backfilling Mining
Received date: 2015-07-13
Revised date: 2015-10-20
Online published: 2016-05-30
In order to reduce the loss of underground resources,improve the economic benefit of mine and the safety of production environment,the“three under” mining is paid more attention.According to the “three under” mining exploitation in Jinkouling mining section as the engineering background,using finite difference software FLAC3D to build the numerical model of mining,and then study the sublevel open stopping with subsequent mining structure parameters influence on the stope stability of surrounding rock and the deformation of the ground surface.The results show that it is not conductive to the maintenance of stope stability and control the deformation of the ground surface,if the panel length is too large and the thickness of top column and column width is too small.Considering the analysis results and the actual mining,reasonable economic situation,the panel length is 60 meters,top pillar thickness is 7 meters and inter column width is 8 meters for the optimal structure parameters,which can effectively maintain the stability of stope surrounding rock,but also can control the surface deformation,providing a certain reference significance for actual mining.
TANG Lizhong , DENG Lifan , JIAN Yinghua . Study on the Optimization of Structural Parameters of Sublevel Open Stopping with Subsequent Backfilling Mining[J]. Gold Science and Technology, 2016 , 24(2) : 8 -13 . DOI: 10.11872/j.issn.1005-2518.2016.02.008
[1] 郑典松.三下开采技术在软岩矿区的创新与应用[J].矿山测量,2014(3):30-32.
[2] 李海峰.高头窑煤矿河流下开采导水裂隙带数值模拟[J].山西煤炭,2011,31(5):38-39,69.
[3] 甯瑜琳,宋嘉栋.急倾斜矿体充填法开采的地表沉陷特性研究[J].矿业研究与开发,2012,32(5):57-59.
[4] 张华兴.对“三下”采煤技术未来的思考[J].煤矿开采,2011,16(1):1-3.
[5] 贺跃光,熊莎,吴盛才.采空区上方高速公路允许移动变形指标研究[J].矿冶工程,2013,32(2):27-30.
[6] Gonzalez Nicieza C.The new three-dimensional subsidence influence function denoted by n-k-g[J].International Journal of Rock Mechanics and Mining Science,2005,42(3):372-387.
[7] Mainil P.Contribution to the study of ground movements under the influence of mining operations[J].International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts,1965,2(2):225-228.
[8] 肖利民,刘晓亮,王宇,等.杨家湾铁锌矿“三下”保护性开采安全措施研究[J].采矿技术,2014,14(2):18-20.
[9] 唐湘华.锡矿山锑矿保安矿柱安全开采技术研究与应用[J].湖南有色金属,2015,31(1):5-7.
[10] 邵拥军,贺辉,张贻舟,等.基于BP神经网络的湘西金矿成矿预测[J].中南大学学报(自然科学版),2007,38(6):1192-1198.
[11] 张春雷,汪顺才,王方汉,等.南京铅锌银矿选矿全尾砂料浆沉降规律研究[J].金属矿山,2010(3):26-28.
[12] 张宇,邵拥军,刘忠法,等.安徽铜陵新桥铜硫铁矿床成矿地质条件及矿床成因分析[J].中南大学学报(自然科学版),2014,45(10):3489-3498.
/
〈 | 〉 |