Optimization of Stope Structural Parameters Based on ANSYS-R Method

  • LONG Keming ,
  • WANG Liguan
Expand
  • School of Resources and Safety Engineering,Central South University,Changsha    410083,Hunan,China

Received date: 2015-03-02

  Revised date: 2015-04-26

  Online published: 2016-02-25

Abstract

For improving the recovery efficiency of mining and increasing its productive capacity,the realization of the optimization of stope structure parameters requires following steps.Firstly,ANSYS software is adopted to carry out the numerical simulation analysis for the stope structural parameters of the twelve different mining programs,and then the relative targeted values are figured out,such as the maximum main stress of a stope,roof subsidence,sides displacement and maximum tension stress.After the careful analysis and selections,the following nine various feasible programs are finally selected out and each stope with the height of less than 14 m and the width of less than 15 m.Secondly,the orthogonal test range method (R Method) is carried out to take the significance analysis and calculation for the targeted values,which are obtained through the demonstrations of above programs,and finally we affirm that the optimal combination of the width and the height of the stope structure is respectively 9 m and 14 m.By applying the optimal stope structure into the field experiment,and taking the actual measurement for the roof subsidence of the stope,we come to obtain the maximum value with 19.91 mm,which makes the relative error of 7.48% comparing with the simulated results.Thus it shows and verifies the high accuracy of the simulated result.The finished stope experiment shows that if the optimal structural parameters by using the ANSYS-R method is carried out,which can not only ensures security and stability of the stope,but also can greatly improve the recovery efficiency and productive capacity of the stope.This method is also proved to be reasonable and reliable through the above experiment,and so that it can provide a decision-making basis for optimization of stope structure parameters design.

Cite this article

LONG Keming , WANG Liguan . Optimization of Stope Structural Parameters Based on ANSYS-R Method[J]. Gold Science and Technology, 2015 , 23(6) : 81 -86 . DOI: 10.11872/j.issn.1005-2518.2015.06.081

References

[1] 董蕾.采动结构参数优化设计及可靠度分析[D].长沙:中南大学,2010.
[2] 蔡美峰.岩石力学与工程[M].北京:科学出版社,2002.
[3] 王文星.岩体力学[M].长沙:中南大学出版社,2004.
[4] 刘爱华,董蕾.海水下基岩矿床安全开采顶板厚度计算方法[J].采矿与安全工程学报,2010,27(3):335-340.
[5] 陈卫忠,李术才,朱维申,等.考虑裂隙闭合和摩擦效应的节理岩体能量损伤理论与应用[J].岩石力学与工程学报,2000, 19(2):131-135.
[6] 杨官涛.地下采场结构参数优化及稳定性的能量突变分析 [D].长沙:中南大学,2007.
[7] 饶运章,陈辉,肖广哲,等.基于FLAC-3D数值模拟采场底部结构设计研究[J].有色金属科学与工程,2011,2(2):43-47.
[8] 王树海,李威.三山岛新立矿区采场结构参数优化研究[J].中国矿业,2009,18(5):53-55,63.
[9] 朱旭波.地下金属矿岩体质量评价与采场结构参数优化研究[D].长沙:中南大学,2012.
[10]万孝衡,王新民,朱阳亚,等.基于组合赋权TOPSIS法的采场结构参数优选[J].黄金科学技术,2014,22(5):69-73.
[11]邓红卫,胡普仑,周科平,等.采场结构参数敏感性正交数值模拟试验研究[J].中南大学学报(自然科学版),2013,44(6):2643-2649.
[12]吴孟达,李兵,汪文浩.高等工程数学[M].北京:科学出版社,2014.
[13]李启月,许杰.深埋工程初始地应力场施加方法比较[J].地下空间与工程学报,2012,8(4):698-702,715.

Outlines

/