Risk Evaluation Research of Uranium Resources Overseas Investment Projects Based on VIKOR Algorithm
Received date: 2014-04-25
Revised date: 2014-06-26
Online published: 2015-01-14
Combined with the current situation that the overseas mineral resources development projects have long investment cycle and variety risk factors,the risk evaluation index system of uranium resources overseas investment projects was built,AHP and VIKOR algorithm were applied to build risk evaluation model of uranium resources overseas investment projects.The model is applied to do the best selection of four investment programs,compared and sorted alternative investment programs through calculating the numerical,and the results show that VIKOR algorithm was effective and operational on risk evaluation of uranium resources overseas investment project.
Key words: uranium resources; mineral development; investment risk; AHP; VIKOR; risk evaluation
LI Cong , CHEN Jianhong . Risk Evaluation Research of Uranium Resources Overseas Investment Projects Based on VIKOR Algorithm[J]. Gold Science and Technology, 2014 , 22(6) : 60 -64 . DOI: 10.11872/j.issn.1005-2518.2014.06.060
[1] 陈念念.统一管理我国铀矿资源[J].中国核工业,2012,(3):35.
[2] 何鸿,张寿庭,韦龙明,等.核电发展形势与对策建议[J].资源与产业,2010,12(4):5-8.
[3] 邹晓明,马杰,王玲玲.我国铀矿资源对外投资战略研究[J].中国矿业,2010,19(12):10-12,29.
[4] 李为相,李帮义.基于泛性模糊数的VIKOR方法研究[J].模糊系统与数学,2010,24(5):68-74.
[5] 刘鸿雁,孔峰.VIKOR算法在房地产估价中应用研究[J].西安建筑科技大学学报:自然科学版,2012,44(5):731-735.
[6] Opricovic S.Multi-criteria optimization of civil engineering systems[D].Belgrade:University of Belgrade,1998.
[7] Opricovic S,Tzeng G H.Compromise solution by MCDM methods:A comparative analysis of VIKOR and TOPSIS[J].European Journal of Operational Research,2004,156:(2):445-455.
[8] 王新民,康虔,秦健春,等.层次分析法—可拓学模型在岩质边坡稳定性安全评价中的应用[J].中南大学学报:自然科学版,2013,44(6):2455-2462.
[9] 王先甲,张熠.基于AHP和DEA的非均一化灰色关联方法[J].系统工程理论与实践,2011,31(7):1222-1229.
[10] Satty T L.A scaling method for priorities in hierarchical structures[J].Journal of Mathematical Psychology,1977,15:234-281.
[11] Satty T L.Axiomatic foundation of the analytic hierarchy process [J].Management Science,1986,32(7):841-855.
[12] Satty T L,Vargas L G.Uncertainty and rank order in the analytic hierarchy process [J].European Journal of Operational Research,1987,32(1):107-117.
[13] 郝旭彬,杨立辉,万胜.基于AHP及模糊综合评判法的采空区稳定性评价[J].黄金科学技术,2013,21(6):63-67.
[14] 韩恩泽,朱颖超,张在旭.基于Fuzzy-AHP的中国石油企业海外投资风险评价[J].河南科学,2010,28(2):235-239.
[15] 肖辉,熊毅.中国矿业企业海外投资风险评价[J].当代经济,2011,(15):48-50.
/
〈 |
|
〉 |