img

Wechat

Adv. Search

Gold Science and Technology ›› 2013, Vol. 21 ›› Issue (5): 57-60.

Previous Articles     Next Articles

Exploration and Practice of the Ecological Mining Development Pattern

HOU Chengqiao,DING Yuexiang   

  1. Shandong Gold Group Co.,Ltd.,Jinan   250014,Shandong,China
  • Received:2013-05-20 Revised:2013-08-30 Online:2013-10-28 Published:2014-04-02

Abstract:

With the rapid development of technology and economy,the production of mineral resource is increased,but the traditional mining development mode only focus on mineral development,production and economic benefit,and often ignores the protection of the ecological environment,that making the mining area ecological environment worsening.In this background,combined with the practice of ecological mining industry for Shandong Gold Group,the connotation of ecological mining and the necessity and urgency of the construction of ecological mining were discussed.By conversion mining development mode,updated development concept,insisted technological innovation and improving the ecological compensation mechanism,a modern mining development mode is proposed which are conserve resources,clean production and recycling of waste by multiple levels.Finally,it can be achieved for the coordinated development between mineral resources development and ecological and environmental protection.

Key words: ecological mining, clean production, technical innovation, development pattern

CLC Number: 

  • F407.1

[1] 杨艺华.我国矿产资源开发利用中的现实问题与对策探讨[J].国土资源科技管理,2005,22(4):66-70.
[2] 李秋元,郑敏.我国矿产资源开发对环境的影响[J].中国矿业,2002,11(2):47-51.
[3] 朱维根.矿产资源开发与可持续发展[J].中国矿业,2004,13(9):44-46.
[4] 李海波,卢才武.矿产资源开发与可持续发展[J].黄金科学技术,2000,8(2):10-14.
[5] 杜恩社,周红升.矿区资源开发的环境影响及其经济损益评价——以河南省新密市某矿区为例[J].资源科学,2008,30(3):440-445.
[6] 张锦瑞.矿产资源开发的生态学思考[J].黄金科学技术,2000,7(4/5):27-29.
[7] 尹飞.矿产资源开发优化配矿模型的再思考[J].黄金科学技术,2013,21(3):80-84.
[8] 董金奎,邱俊刚,张忠辉,等.焦家金矿望儿山矿区沉降监测及规律研究[J].现代矿业,2012,(8):73-75.
[9] 王大为,王卓,李磊,等.上向水平扇形进路采矿方法的研究及应用[J].黄金科学技术,2012,20(2):67-70.
[10] 程琳琳,胡振琪,宋蕾.我国矿产资源开发的生态补偿机制与政策[J].中国矿业,2007,16(4):11-13,18.

[1] REN Zhuli,WANG Liguan. Risk Analysis of Underground Mine Production Scheduling Based on Metal Price Uncertainty [J]. Gold Science and Technology, 2017, 25(6): 52-60.
[2] LI Wei,WANG Qingshuai,LI Guodong. Study on the Dynamic Optimization of Mine Technical and Economical Indexes [J]. J4, 2011, 19(4): 68-72.
[3] SHENG Xiaoju. The Application of Systematic Approach in the M ine Equipment M anagement [J]. J4, 2008, 16(3): 49-51.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!