Discussion on the Application of Sorting and Installation Scheme of Skip in Blind Shaft

GAO Weiwei1,LI Ruirui1,ZHONG Lijun1,WANG Shanjian1,WANG Shiguo2   

  1. 1.Shandong Gold Group Yantai Design & Research Engineering Co.,Ltd.,Yantai   264006,Shandong,China;
    2.Shandong Gold Mining (Linglong) Co.,Ltd.,Zhaoyuan   265400,Shandong,China
  • Received:2013-01-21 Revised:2013-03-14 Online:2013-06-28 Published:2013-11-19

Abstract:

Briefly introduced the installation methods of large and medium-sized skip,details of the application after the disintegration of piecewise installation scheme in blind shaft,Linglong gold mine.In view of the large and medium-sized skip need to collapse to implement the segmentation assembled by wellhead roadway and cage to transport the blind shaft,through the site condition and equipment force analysis,integrated with high strength flange connection,reaming bolt positioning and stagger the collapse location method and process,designed the scheme of  skip disintegration.The scheme of  skip disintegration overcome the skip size,disassembly and assembly of large deformation,the connection strength is low,making detailed and reasonable skip sorting scheme,successfully resolved the problem of  the installation of large and medium-sized skip in blind shaft after the disintegration.

Key words: skip, disintegration, blind shaft

CLC Number: 

  • TD44

[1] 北京有色冶金设计院.金属矿山采矿设备设计[M].北京:冶金工业出版社,1977.
[2] 高光.盲竖井位选择的可行性研究[J].黄金科学技术,2006,14(4):34-37.
[3] 郭强军.盲竖井定向测量[J].黄金科学技术,2004,12(3):46-48.
[4] 荆炜华.大型箕斗安装与更换方式探讨[J].煤炭工程,2010,(8):12-13.
[5] 冯宝华.浅谈大型箕斗及配套设备的技术进展[J].中州煤炭,2012,(7):69-70.