img

Wechat

Adv. Search

J4 ›› 2012, Vol. 20 ›› Issue (2): 71-73.

• article • Previous Articles     Next Articles

Discussion on the Enhancement of Blasting Quality for Multi-jointed Fracture Ore-rock

LIU Fujiang,WANG Yuankui,WANG Zhenjun,WEI Kailin,WU Zhiming   

  1. Sanshandao Gold Mine,Shandong Gold Mining (Laizhou) Co.,Ltd.,Laizhou   261442,Shandong,China
  • Received:2011-10-29 Revised:2011-12-15 Online:2012-04-28 Published:2012-08-21

Abstract:

Cangshang mining district of Sanshandao gold mine is an alteration-type gold deposit formed in low-middle tempreture hydrotheromal filling riftzone,whose fissure is rather complex.Rocks are so unstable that once detonation wave of emulsion explosive run into these structures,echoattenuation comes into being,resulted in the increases of boulder frequency as well as loss dilution.From seven aspects of theory and practice, the reason of revetment, islet,bedrock and block produced in explosive of fissure ore-rock with multiple joints was analyzed based on the physical situation in excavation plant. Appropriate solution was proposed by changing the explosice metarials type, perforation direction,and the detonation way.The boulder frequency was decreased from 11% to 1%, and the loading efficiency increased by 21.2%.The 10% of processing ore amount was more than that original without any additional devices,which can bring significant economic benefits, and is of general significance.

Key words: Multi-jointed fracture ore-rock, Blasting quality, Alteration type gold deposit, Cangshang mine area, Sanshandao gold mine, Shandong Province

CLC Number: 

  • TD853.34

[1] 采矿手册编辑委员会.采矿手册[M].北京:冶金工业出版社,2006.
[2] 黄金矿山实用手册编写组.黄金矿山实用手册[M].北京:中国人民出版社,1990.
[3] 采矿设计手册编辑委员会.采矿设计手册矿床开采(上卷)[M].北京:中国建筑出版社,1989.
[4] 焦玉书.金属矿山露天开采(下)[M].北京:冶金工业出版社,1989.
[5] 李宝祥.金属矿山露天开采[M].北京:冶金工业出版社,1992.
[6] 杨万托,余天堂.一种新的节理裂隙弹塑性模型[J].岩土力学,2003,24(2):270-272.
[7] 任青文.块体单元法及其在岩体稳定分析中的应用[J].河海大学学报,1995,23(1):1-7.

[1] DONG Jinkui,SHEN Yan,QIU Jungang. Investigation of Joint Fissure and Analysis of Ore-rock Stability in Sizhuang Mining of Jiaojia Gold Deposit [J]. J4, 2012, 20(2): 58-61.
[2] CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng. Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine [J]. J4, 2012, 20(2): 62-66.
[3] WANG Dawei, WANG Zhuo,LI Lei, LI Weining,QIN Weili,LIU Hongwei, LI Weiguo. Research and Application of the Upward Horizontal Fan Drift Mining Method [J]. J4, 2012, 20(2): 67-70.
[4] BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69.
[5] CHEN Hong-Bing, WANG Yong-Cheng, HU Shi-Li. Stuffing and Dosage Calculation of Using High Concentration to Concrete Tailings [J]. J4, 2007, 15(3): 58-61.
[6] CHEN Hua-Zhen, SUN Chao, SONG Chang-Bao. Some Prorblems of the New Tailing Cemnent Material in the Application [J]. J4, 2006, 14(1): 32-35.
[7] MAO Zhen-Shan, LIU Hua-Qing, LI He-Beng, XUE Tian-Chi. Study on The Clot of Injection [J]. J4, 2006, 14(3): 22-25.
[8] CAO Guorong. Reasonable Underground Filling Strengthening Surface Protection [J]. J4, 2005, 13(6): 27-29.
[9] LI Xingshang,GUO Zhonglin. Application of Waste Fill in Xinqiao Mining Industry Company [J]. J4, 2004, 12(2): 41-45.
[10] LIU Xuesheng, XUE Tianxi,WANG Xiujuan. Study on the Cemenited of Separate Wall [J]. J4, 2004, 12(1): 5-7.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!