img

Wechat

Adv. Search

J4 ›› 2012, Vol. 20 ›› Issue (2): 62-66.

• article • Previous Articles     Next Articles

Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine

CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng   

  1. Zhaojin Mining Industry Co.,Ltd.,Zhaoyuan   265400,Shandong,China
  • Received:2011-12-08 Revised:2012-02-21 Online:2012-04-28 Published:2012-08-21

Abstract:

Mining Method of mill-run tailing filling is a relatively mature technology.The key of the method is how to apply the technology.At present,the pillarless caving  is used in Xiadian Gold which is applicable for stability and heavy orebody,but not for the corner orebody or broken orebody.In order to solve the problem of high ore loss,dilution rate and low security of the corner or broken orebody mining,to mine more ore efficiently and safely,to take advantage of limited mineral resources and meet a substantial increase in the processing plant.Xiadian Gold selected  multiple stope,by practicing,analysising carefully and adjusting the parameters,obtained multiple sets of valid and reliable data, and ultimately developed a simple,effective and practical mining method of horizontal stratified entrance-filling of tailing, acquired a corking economy benefit.Mining is a subject with good practical character.Every mining method may supply each other and learn from others's strong points to offset one's weakness.Being a supplementation to other mining methods,the mining method is introduced in this paper with a good value of application.

Key words: Tailing filling, Corner broken orebody, Application, Xiadian gold deposit

CLC Number: 

  • TD853.34

[1] 孔庆峰,赵亮,赵春荣.浅谈岩金地下矿山采矿方法的选择[J].黄金, 2001,12(10):22-25.
[2] 曹其华.后和睦山矿体采矿方法实验研究[D].沈阳:东北大学,2004.
[3] 路仁江,刘鹏金,娄伟华.高水固结充填采矿法工艺创新与应用[J].黄金科学技术,2011,19(1):51-54.
[4] 丁剑锋,何顺斌,刘大兵,等.盘区采矿法在 三山岛金矿的研究与应用[J].黄金科学技术,2011,19(3):63-67.
[5] 李阳,彭康,张小刚,等.上盘进路下盘水平分层联合采矿法试验研究[J].黄金科学技术,2010,18(1):77-79.
[6] 徐东,胡忠强.中深孔采矿法在新城金矿的研究与应用[J].黄金科学技术,2010,18(5):72-75.
[7] 周旭.水压支柱护顶大进路上向水平分层充填采矿工艺技术研究[D].长沙:中南大学,2009.
[8] 任建平.会泽铅锌矿采场爆破及临时支护技术应用研究[D].长沙:中南大学,2010.
[9] 周宗红.倾斜中厚矿体低贫损分段崩落法研究[D].沈阳: 东北大学,2006.
[10] 宋继勋.金厂峪金矿难采矿体采矿过程中的顶板稳定性研究[D].石家庄:河北理工大学,2005.
[11] 张丹.夏甸金矿采矿方法研究[D].沈阳:东北大学,2003.
[12] 宋开华.联合采矿法在金平镍矿的应用[J].有色金属设计, 1996,(2):12-19.
[13] 柴建设,甘德清,徐在强,等.金厂峪金矿难采矿体采矿方法的试验研究[J].金属矿山,2000,(6):18-19.
[14] 李云华,周正光,戴开雁,等.充填采矿法在金平镍矿的应用[J].云南冶金,2003,32(4):6-10.

[1] DONG Jinkui,SHEN Yan,QIU Jungang. Investigation of Joint Fissure and Analysis of Ore-rock Stability in Sizhuang Mining of Jiaojia Gold Deposit [J]. J4, 2012, 20(2): 58-61.
[2] WANG Dawei, WANG Zhuo,LI Lei, LI Weining,QIN Weili,LIU Hongwei, LI Weiguo. Research and Application of the Upward Horizontal Fan Drift Mining Method [J]. J4, 2012, 20(2): 67-70.
[3] LIU Fujiang,WANG Yuankui,WANG Zhenjun,WEI Kailin,WU Zhiming. Discussion on the Enhancement of Blasting Quality for Multi-jointed Fracture Ore-rock [J]. J4, 2012, 20(2): 71-73.
[4] BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69.
[5] CHEN Hong-Bing, WANG Yong-Cheng, HU Shi-Li. Stuffing and Dosage Calculation of Using High Concentration to Concrete Tailings [J]. J4, 2007, 15(3): 58-61.
[6] CHEN Hua-Zhen, SUN Chao, SONG Chang-Bao. Some Prorblems of the New Tailing Cemnent Material in the Application [J]. J4, 2006, 14(1): 32-35.
[7] MAO Zhen-Shan, LIU Hua-Qing, LI He-Beng, XUE Tian-Chi. Study on The Clot of Injection [J]. J4, 2006, 14(3): 22-25.
[8] CAO Guorong. Reasonable Underground Filling Strengthening Surface Protection [J]. J4, 2005, 13(6): 27-29.
[9] LI Xingshang,GUO Zhonglin. Application of Waste Fill in Xinqiao Mining Industry Company [J]. J4, 2004, 12(2): 41-45.
[10] LIU Xuesheng, XUE Tianxi,WANG Xiujuan. Study on the Cemenited of Separate Wall [J]. J4, 2004, 12(1): 5-7.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!