CAO Xueyong,YANG Yong,ZHAO Jie,LI Weining
Received:
Revised:
Online:
Published:
Abstract:
The mechanization level of Ⅲ vein orebody in Jiaojia gold mine,which is discovered,recovered and prevented later thanⅠvein orebody,is difficult to be raised because of the ore occurrence conditions.This causes the results of settlement ratio imbalance,ventilation system disorders,and makes the production management more difficult. To solve these problems,we streamline the processes of Ⅲ vein orebody by optimizing mining methods according to the principle of advanced technology and economic rationality.Secondary avalanche process of Ⅲ vein orebody groups is identified according to the situation of backward,slowly recovery and difficult to manage.The results show that the optimization process works more effective,costs less tunneling project investment,accelerates the relative recovery speed,also has more balancedand stable mining settlement.
Key words: Optimization of mining method, Secondary avalanche, Shorten production middle, Stable development, Jiaojia gold mine, Shandong Province
CLC Number:
CAO Xueyong,YANG Yong,ZHAO Jie,LI Weining. Research on the Mining Method Optimization of Ⅲ Vein Orebody in Jiaojia Gold Mine, Shandong Province[J].J4, 2011, 19(4): 59-61.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2011/V19/I4/59
[1]解世俊.金属矿床地下开采[M ].北京:冶金工业出版社,1999. [2]刘胜光.山东焦家金矿残采矿回收技术的研究[J].黄金科学技术,2010,18(1):80-82. [3]杨勇.山东焦家金矿北翼破碎矿体采矿方法研究[J].黄金科学技术,2010,18(2):51-52.
Cited