img

Wechat

Adv. Search

J4 ›› 2010, Vol. 18 ›› Issue (6): 54-57.

• article • Previous Articles     Next Articles

The Design for Recycling and Using of Low-grade Ore in Jiaojia Gold Mine

LIU Runtian,QIU Jungang,ZHANG Zhonghui,GAO Haifeng,LI Jiyu   

  1. Jiaojia Gold Mine,Shandong Gold Mining(Laizhou)Co.,Ltd.,Laizhou 261441,Shandong,China
  • Received:2010-09-20 Revised:2010-09-30 Online:2010-12-30 Published:2011-03-10

Abstract:

Jiaojia gold plate under the main ore occurrence of the large scale and relatively low grade ore geological resources, higher gold prices in recent years to seize the favorable opportunity to complete the main ore body has been taken under a separate set of low grade ore Recycling and the main ore ore body has not yet recovered the synchronization recovery, and reduce the rate of decline in mining field, to extend the service life of mine effect is obvious, not only the full recovery of the national mineral resources, and the obvious economic benefits of mining to other similar cases have good of reference.

Key words: Low-grade ore, Recycling, Jiaojia gold mine, Shandong Province

CLC Number: 

  • TD92

[1]陈玉民.黄金矿山低品位资源动态评估及应用研究[R].济南:山东黄金集团,2009.
[2]李军峰.山东玲珑金矿低品位矿石的开发利用[J]. 黄金科学技术,2010,(2).
[3]张军胜.杨树金矿低品位矿石开采可行性研究[J]. 黄金,2010,(4):28- 31.
[4]周紫辉. 露天矿低品位矿石的利用[J].矿冶,2009,(2):18- 22.
[5]郑永学.矿山岩体力学[M].北京:冶金工业出版社,1995.
[6]解世俊.金属矿床地下开采[M].北京:冶金工业出版社,1995.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!