Wechat
J4 ›› 2010, Vol. 18 ›› Issue (5): 84-86.
• article • Previous Articles Next Articles
QIU Jungang,YU Bin,ZHANG Zhonghui,DENG Yaozeng,LENG Hansong
Received:
Revised:
Online:
Published:
Abstract:
Jiaojia gold in the construction process, driving through the construction program to improve the use of electric rake to rake the funnel to the tub with rocks, not only shorten the operation time to improve operational efficiency and reduce operating costs, with less input devices, and simple construction organization advantages of driving on the other mining projects with the reference.
Key words: Improved construction, Auxiliary power harrow, Efficiency, Reduce costs
CLC Number:
QIU Jungang,YU Bin,ZHANG Zhonghui,DENG Yaozeng,LENG Hansong. Study on the Construction of Auxiliary Scraper in Engineering Boring[J].J4, 2010, 18(5): 84-86.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2010/V18/I5/84
[1]陈广喜.高效掘进技术的研究与实践[J]. 煤炭工程,2009,2(3):32- 36. [2]田贵有.快速掘进在锡铁山斜坡道工程中的应用[J].采矿技术,2006,(6):18- 20. [3]陈国山.优化斜坡道设计改善井下采矿条件[J]. 中国矿业,2007(, 12):19- 22. [4]郑永学.矿山岩体力学[M].北京:冶金工业出版社,1995. [5]李敬.北京首云铁矿主斜坡道与- 16 中段贯通实践[J]. 中国矿山工程,2008,(4):7- 11. [6]解世俊.金属矿床地下开采[M].北京:冶金工业出版社, 1995.
Cited