J4 ›› 2010, Vol. 18 ›› Issue (5): 68-71.
• article • Previous Articles Next Articles
JIN Sheying
CLC Number:
[1]李启月,王树海,范作鹏.盘区阶梯式无间柱连续充填采矿法试验研究[J].矿冶工程,2010,(3):36- 39. |
[1] | LIU Dabing,ZHOU Shilin,QI Zhaojun,HE Shunbin. Research of Mining Method Optimization Based on the Fuzzy Mathematics Method [J]. J4, 2010, 18(6): 42-45. |
[2] | BI Hongtao,WANG Cunwen,LI Wei. The Study of Microseismic Monitoring on Rock Failure and Disaster-induced in Gold Mining Undersea [J]. J4, 2010, 18(5): 52-54. |
[3] | LIU Jian. Discussion on the Recovery Method of Cuo’a Gold Deposit in Ganzi,Sichuan [J]. J4, 2009, 17(2): 54-57. |
|