img

Wechat

Adv. Search

J4 ›› 2009, Vol. 17 ›› Issue (1): 49-52.

• article • Previous Articles     Next Articles

Discussing on Problems about Designing and Construction Technology of Static Shrinkage Method

ZHANG Qi,WANG Li,WANG Xiaoqing   

  1. Song County Qianhe Gold Mining Co.,Ltd.,China National Gold Group Corporation,Luoyang   471441,Henan,China
  • Received:2008-09-22 Revised:2008-10-07 Online:2009-02-28 Published:2014-01-26

Abstract:

This paper discussed several problems about designing and construction technology of static shrinkage method,which is tested and researching atQianhe gold mine in 2008.We put forward some op inions, including technique of three intensifying operation,the recoverymethod of triangle ore heap,hangingwall rock bolting support and removing ore from stope orepass,which can supply a reference for related engineering personnel and extended application.

Key words: Static shrinkage method, Ore heap recovering, Surrounding rock bolting support, Removing ore from stope orepass, Qianhe gold deposit, Gold, Henan

CLC Number: 

  • TD853.33


[1] 长春黄金研究院.河南前河金矿采矿方法试验研究方案设计说明书
[R].长春:长春黄金研究院,2008.

[2] 长春黄金研究院.长春黄金研究院辉煌五十年
[R].长春: 长春黄金研究院,2008.

[3] 龚清平,李新福,姚香.河台金矿三强作业技术的应用
[J].黄金,2002,23(5):20-22.

[4] 采矿手册编委会.采矿手册(2)
[M].北京:冶金工业出版社,1990:150-154.

[5] 姚香.岩金地下开采技术进步与展望
[J].黄金,2001,22(1):16-22.

[6] 刘力,薛安邦,刘怀智.静态留矿充填水泥锚杆支护采矿法研究
[J].金属矿山,1994,(4):23-26.

[7] 荆龙华,高若峰.浅孔留矿法在甲乌拉铅锌矿的应用
[J].黄金科学技术,2008,16(3):57-59.

Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!