L IWei,WANG Baosheng, GAO Yongsheng
Received:
Revised:
Online:
Published:
Abstract:
<2. 1m ×3. 0m ballmill has been installed and app lied in Sanshandao gold mine instead of <1. 5m ×3. 0m ballmill. It p rovides great experience for smallmill exchange bigmill, and p rovides both economy and easy successfully method for transformation of gold concentrate regrinding equipment of old concentrator
Key words: Ballmill, Transformational and installation, Application, Sanshandao gold mine
CLC Number:
LIWei,WANG Baosheng, GAO Yongsheng. The Applica tion andMethod of Insta lla tion and Transforma tiona l of Ba llM ill[J].J4, 2008, 16(6): 55-57.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2008/V16/I6/55
[ 1 ]《选矿设计手册》编委会. 选矿设计手册[M ]. 北京:冶金工业出版社, 1988. [ 2 ] 邱宣怀,郭可谦,吴宗泽,等. 机械设计[M ]. 北京:高等教育出版社, 1997. [ 3 ] 周恩浦. 矿山机械(选矿机械部分) [M ]. 北京:冶金工业出版社, 1986. [ 4 ] 冶金机械设备安装工程施工及验收规范[M ]. 北京:冶金工业出版社, 1998. [ 5 ] 希洛夫N M. 矿山机械及其修理[M ]. 北京:煤炭工业出版社, 1956. [ 6 ] 盛小军. 球磨机主轴承瓦修复工艺[ J ]. 黄金科学技术,2007, 15 (6) : 59-61.
Cited