img

Wechat

Adv. Search

J4 ›› 2008, Vol. 16 ›› Issue (6): 48-50.

• article • Previous Articles     Next Articles

Exper imenta l Study on Comprehensive Shr inkageMethod in Na lin Gold Deposit

L IU J ian1 , FAN Manhua1 ,DENG Zhigao2 , ZHANG Qingsong2 , ZHENG Chengying2   

  1. 1. Guangdong Gaoyao Hetai Gold M ine, Gaoyao 526127, Guangdong, China;
    2. Guangxi HongyiM ining Industry Co. , L td. , Fengshan 547611, Guangxi, China
  • Received:2008-05-27 Revised:2008-06-28 Online:2008-12-23 Published:2011-07-06

Abstract:

We p roposed mining scheme ofmultip le segments shotcrete and rock bolt support comp rehensive shrinkage ethod, according to mining technical condition and mining situation in recent years ofNalin gold deposit in Guangxi.This mine is on trial currently. We p redict it can satisfy p roduction technology requirements of the mine through app lication variety of construction technology, especially for safety operation demand ofmining and outmine aspects, and it
can satify p roduction capacity demand of the mine.

Key words: Comp rehensive shrinkage method, Variety of construction technology, Experimental study, Nalin gold
mine

CLC Number: 

  • TD853. 33   

[ 1 ] 樊满华. 浅孔留矿法的新工艺和新技术综述[ J ]. 黄金科学技术, 2002, 10 (2) : 6-12.
[ 2 ] 侯朝炯,勾攀峰. 巷道锚杆支扩围岩强度强化机理研究[ J ]. 岩石力学与工程学报, 2000, 19 (3) : 342-345.
[ 3 ] 王群. 浅孔留矿法采矿设计若干原则的探讨[ J ]. 黄金科学技术, 2004, 12 (1) : 29-33.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!