img

Wechat

Adv. Search

J4 ›› 2008, Vol. 16 ›› Issue (3): 57-59.

• article • Previous Articles     Next Articles

Application of Short_hole Shrinkage M ethod in Jiawula Lead-zinc Deposit

JING Longhua,GAO Ruofeng   

  1. Heilongjiang  Central Academy of Nonfferrous Menal Exploration and Reasearch ,Harbin   150042, Heilongjiang,China
  • Received:2008-01-21 Revised:2008-03-20 Online:2008-06-26 Published:2011-07-04

Abstract:

This article describes the application of Short—hole shrinkage naeth0d in Jiawu1a lea nc deposit in detail.it  points out that the employnaent of Shallow hole drilling, Z-shaped pattern of laying blast holes, unc0upled charging and rnlcmsecon【1|】last IS capable of improving productivity and efficiency of 0re block, reducing mining c0st, and increasmg econ0m c profits m the mining of steep dip and narrow vein, of which the ore rock is m0derateiv stable. the deI11arcarion line between r。ck and。re is c1ear and the change。f dip ang1e is n。t s。great

Key words: Steeply’inclined thin orebody, Short&mdash, hole shrinkage method, Mining cutting, Stoping

CLC Number: 

  • TD853.331

[1] 解世俊.金属矿床地下开采[M].北京:冶金工业出版社,1994.
[2] 周昌达.井巷工程[M].北京:冶金工业出版社,1994.
[3] 林德余.矿山爆破工程[M].北京:冶金工业出版社,1993.
[4] 曹胜概,钱鸣高.采场支架一围岩关系的新研究[J].煤碳学报,1998,23(6):575—579.
[5] 钱呜高,何富连,李全生.综采工作面矿压显现与支护质量监控[J].中国煤碳,1995,(7):48—51.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!