J4 ›› 2008, Vol. 16 ›› Issue (3): 54-56.
• article • Previous Articles Next Articles
YAO Hanqiu
Received:
Revised:
Online:
Published:
Abstract:
By building unified independent four class controlling network and laying head class control network as a basis in mining area,taking a series of actions such as using J2 transit to increase angle measurement accuracy,adopring various measures to reduce reading erIor of side measurement with ruler,adjusting middle,waist line timely,the surveying precision of linking—up main transport adit will meet the requirements of design and standard accuracy.
Key words: Hetai gold mine, Main transport adit, Linking—up construction survey, Controlling network, Measuring accuracy
CLC Number:
YAO Hanqiu. Practice of Linking-up Constructiong Survey in the +1 60m M ain Transport Adit of Hetai Gold M ine[J].J4, 2008, 16(3): 54-56.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2008/V16/I3/54
[1] 刘延伯.工程测量[M].北京:冶金工业出版社,1984. [2] 陈永奇.工程测量学[M].北京:测绘出版社,1995. [3] 周立吾,张国良,林家聪.矿山测量学(生产矿井测量)[M].江苏:中国矿业大学出版社,1989. [4] 阜新矿业学院,中国矿业学院,焦作矿业学院.矿区控制测量[M].北京:煤炭工业出版社,1980. [5] 广东省煤炭工业学校.测量学(试用教材)[M].佛山:广东省煤炭工业学校翻印,1975.
Cited