Abstract:

continuously the exaltation mineral return of stone adopt a rate,lower a loss rate,is a mineral mountain to mine the technique that the resources continuously pursue to reform a target.lazigou gold mine in muping in the last years, at tail sand fill mine for minerals method of foundation up, replace bottom mineral pillar, false bottom to change a mineral pillar with the artificial false lane etc. technique application aspect, obtain mature of experience. special in mediumly the thin and thick quartz vein the type the gold mine body mine of application, returned to adopt a rate to have bigger exaltation, safety technique measure credibility, construction craft simple, investment economical, the performance be considerable.

Key words: bottom post, concrete, concrete-bottom, concrete-lane

CLC Number: 

  • TD853.341

[1] 长沙冶金设计研究院.人工假底在薄脉型金矿中的试验[R].长沙:长沙冶金役计研究院,2000.
[2] 宋文志.人工假底在乳山金矿采矿中的应用[J](内部).山东黄金,1988,(4):53~54.
[3] 周昌达.井巷工程[M].北京:冶金工业出版社,1978.

[4] 北京有色冶金设计研究总院.采矿设计手册[M].北京:中国建筑工业出版社,1989.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!