img

Wechat

Adv. Search

J4 ›› 2006, Vol. 14 ›› Issue (3): 22-25.

• article • Previous Articles     Next Articles

Study on The Clot of Injection

MU Zhenshan,LIU Xuesheng ,LI Heping, XUE Tianxi   

  1. The Hexi Gold Mine, Shandong,Zhaoyuan   265400, China
  • Received:2006-02-15 Revised:2006-04-13 Online:2006-02-25 Published:2011-11-22

Abstract:

Based on the penetrate into study, the paper systematically analyzed and summarized the application on the cemented stowing of digging groove and clot of injection in the horizontal sub-level mining. According to compare proof by sufficiency, operating efficiency, intention of labor of cemented stowing ,we draw the conclusion that cement stowing of separate wall have a series of advantage,such as facility, high efficiency , good quality , decrease every sub-levelmining period and poverty rate etc . Thereby it is verified that cemented stowing of separate wall is efficacious in the mine that mining method is horizontal sub-level mining.

Key words: clot of injection, groove on the side, cemented stowing, horizontal sub-level

CLC Number: 

  • TD853.34
[1] DONG Jinkui,SHEN Yan,QIU Jungang. Investigation of Joint Fissure and Analysis of Ore-rock Stability in Sizhuang Mining of Jiaojia Gold Deposit [J]. J4, 2012, 20(2): 58-61.
[2] CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng. Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine [J]. J4, 2012, 20(2): 62-66.
[3] WANG Dawei, WANG Zhuo,LI Lei, LI Weining,QIN Weili,LIU Hongwei, LI Weiguo. Research and Application of the Upward Horizontal Fan Drift Mining Method [J]. J4, 2012, 20(2): 67-70.
[4] LIU Fujiang,WANG Yuankui,WANG Zhenjun,WEI Kailin,WU Zhiming. Discussion on the Enhancement of Blasting Quality for Multi-jointed Fracture Ore-rock [J]. J4, 2012, 20(2): 71-73.
[5] BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69.
[6] CHEN Hong-Bing, WANG Yong-Cheng, HU Shi-Li. Stuffing and Dosage Calculation of Using High Concentration to Concrete Tailings [J]. J4, 2007, 15(3): 58-61.
[7] CHEN Hua-Zhen, SUN Chao, SONG Chang-Bao. Some Prorblems of the New Tailing Cemnent Material in the Application [J]. J4, 2006, 14(1): 32-35.
[8] CAO Guorong. Reasonable Underground Filling Strengthening Surface Protection [J]. J4, 2005, 13(6): 27-29.
[9] LI Xingshang,GUO Zhonglin. Application of Waste Fill in Xinqiao Mining Industry Company [J]. J4, 2004, 12(2): 41-45.
[10] LIU Xuesheng, XUE Tianxi,WANG Xiujuan. Study on the Cemenited of Separate Wall [J]. J4, 2004, 12(1): 5-7.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!