img

Wechat

Adv. Search

J4 ›› 2004, Vol. 12 ›› Issue (6): 27-30.

• article • Previous Articles     Next Articles

The Combination Harnessing of Anchoring and Grouting to The Subsidence Area of East Mountain of Linglong Gold Mine

WANG Peiyue1,WANGQianyuan2   

  1. 1.Beijing University of Science and Technology,Beijing 100083,China;
    2.Department of Science and Information of Qingdao University of Science and Technology,Shandong qingdao 266033,China
  • Received:2004-10-19 Revised:2004-11-04 Online:2004-12-28 Published:2011-09-21

Abstract:

For the surface subsidence problem of the mined-out area covered with crushed rocks bankette,based on the exploration and research of geologic radar,this paper put forward the combination harnessing method of anchoring and grouting in which the anchoring is primary.This method resolved technology problems,such as boring,protecting hole,grouting and anchoring in the crushed rocks bankette by simple equipment and technology.It also has important significance to the harnessing of surface subsidence caused by the mined-out area falling of heavy-inclined and deep ore body.

Key words: surface subsidence, mined-out area falling, anchoring and grouting harnessing

CLC Number: 

  • TD29

[1] 程骁,张凤祥.土建注浆施工与效果监测[M].上海:同济大学出版社,1998,462.
[2] 地基处理手册[M].北京:中国建筑工业出版社,2000.8(第二版).
[3] 彭振斌.注浆工程设计计算与施工[M].武汉:中国地质大学出版社,1997.
[4] 李相然,岳同助.城市地下工程实用技术[M].北京:中国建材工业出版社,2000.
[5] 高磊.矿山岩石力学.北京: 冶金工业出版社[M],1979.
[6] 李夕兵,冯涛.地下建筑工程[M].长沙:中南工业大学出版社,1999.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!