Through analysis and examination of the law of ground pressure and calculation of Finite Elemend Method,Rock mechanics and Boundary Elemend method,the paper gives the law of activity of ground pressure in the Xiao Tie Shan mine.According to practice,the paper improves drawing sequence,the parameter of structure and present layout of project.So the quality of project in the mine has been improved,and the operation has been become safer and more efficient.
Key words: the law of ground pressure, layout and cross section of roadway, drawing sequence
CLC Number:
CAI Yinfeng,WANG Yongzhi,GUO Zhonglin. Xiao Tie Shan Mine’s Research of the Law of Ground Pressure[J].J4, 2004, 12(6): 19-22.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2004/V12/I6/19
[1] 蔡亲友.小铁山矿深部地压研究报告[R].江西南方冶金学院,1995. [2] 宗海祥,桑守勤.上向巷道式尾砂胶结充填采矿法工业试验与研究[R].北京:北京矿冶研究总院,1995.
Cited