img

Wechat

Adv. Search

J4 ›› 2004, Vol. 12 ›› Issue (3): 15-17.

• article • Previous Articles     Next Articles

Operation of AudoCAD in Mine Geological Survey

WEN Shiqing   

  1. Hetai Gold Mine,Guangdong Gaoyao 526127,China
  • Received:2003-12-09 Revised:2003-12-13 Online:2004-06-28 Published:2011-09-15

Abstract:

The mine operation of AutoCAD in Hetai Gold Mine,proved peripherial working procedure of measurement and also changed in interior working ways of measurement,raised working efficiency and promoted technology progress of mine's geological survey.

Key words: Mine survey, Peripherial statistics, statistics choose, organize statistics, analytic diagram

CLC Number: 

  • TD17

[1] BI Lin,ZHAO Hui,YANG Xinfeng. Study on Principle and Method for Calculation of Earthwork Volume in the DIMINE Software [J]. Gold Science and Technology, 2017, 25(3): 108-115.
[2] TANG Yuntao. Application of the GNSS Technology in Control Survey of Mine Area [J]. Gold Science and Technology, 2015, 23(2): 76-82.
[3] TIE Zhu,CHAO Baoleng,JI Zhu. In-situ Stress Measurement and Analysis of Tugurige Gold Deposit [J]. Gold Science and Technology, 2014, 22(6): 73-76.
[4] GUO Qiangjun. The Application of S86T(GPS)RTK Technology in the Modern Mine Surveying [J]. J4, 2011, 19(6): 69-71.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!