img

Wechat

Adv. Search

J4 ›› 2004, Vol. 12 ›› Issue (1): 8-12.

• article • Previous Articles     Next Articles

Probeinto the Technology Problems of Dry-placed Fill Mining Technology

ZHANG Gui xuan   

  1. Hetai Gold Mine, Guangdong Gaoyao 526127,China
  • Received:2003-08-12 Revised:2003-10-05 Online:2004-02-28 Published:2011-09-15

Abstract:

This article gave an initial probe into fill system,stope standard,slice height,landing method,stopping structure,paving material & stope supporting according to the flat-backcut-and-dry-placed-fill technology.

Key words: Dry-placed fill method, fill system, stope standard, shaft structure, paving material

CLC Number: 

  • TD853.34+1

[1]《中国黄金生产实用技术》编委会.中国黄金生产实用技术[M].北京:冶金工业出版社,1998.
[2] 王学敏.高龙金矿上向进路干式充填采矿法试验研究[J].黄金,1999,20(1):21-251.
[3] 李建甘,姚香.高村矿区二次贫化原因分析及降低方法实践[J]1 黄金,2002,23(4):30-321.
[4] 欧阳化兵.干式充填采矿法放矿溜井的改进方法[J].有色矿冶,2002,(1):28-301.
[5] 王黎,王彦丰,刘兰菊.干式充填采矿法几个技术问题的探讨[J].黄金,2000,21(2):24-271.

Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!