Select& Apply Stope Paving Separate Material in the Use of Dry-placed Fill Method

FAN Manhua   

  1. Hetai Gold Mine,Guangdong Gaoyao 526127,China
  • Received:2003-08-05 Revised:2003-09-13 Online:2004-02-28 Published:2011-09-15

Abstract:

Use dry-placed fill method we need a layer of separating material in order to separate ore from paving material,to reduce loss &dilution.So this kind of material should be of high intensity,low cast,good index of loss & dilution & can be reuse.For the large scope & bumpy of the stope,Hetai Gold Mine applied c7.5 # danded cement grout to build separate layer with 0.15m depth standard,which had a good effect.

Key words: Hetai Gold Mine, Gold-deposit, Dry-placed fill method, Paving material, Selection&application

CLC Number: 

  • TD853.34+1

[1]  采矿手册编委会.采矿手册(4)[M].北京:冶金工业出版社,1990:203-204.
[2]  王斯亮,姚香.河台金矿资源利用与探矿增储途径[J].黄金科学技术,2001,9(2):45-46.
[3]  张桂暄.干式充填采矿法存在的问题与改进实践[J].黄金科学技术,2002,10(5):25-26.
[4]  王黎,王彦丰,刘兰菊.干式充填采矿法几个问题的探讨[J].黄金,2001,9(2):24-27.

Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!