J4 ›› 2003, Vol. 11 ›› Issue (4): 38-42.

• article • Previous Articles     Next Articles

SHAFT-LANE TIMBERING AND MAINTENANCE TECHNOLOGY OF HETAI GOLD MINE

LUO Tieniu   

  1. Hetai Gold Mine, Gaoyao Guangdong 526127, China
  • Received:2002-12-02 Revised:2003-03-11 Online:2003-08-30 Published:2011-11-24

Abstract:

This paper introduces permanent and temporary timbering and maintenance technology of Hetai Gold Mine. During production process, commonly used laneways are likely to be cracked or damaged by reasons of existence of joint weaker plane of rock body, plus vibration caused by demolish and ground pressure of hollow areas, etc. The ways of shaft-lane maintenance are various; construct ion workmanship and rapidity of timbering are of most importance, so as to guarantee safe production. The timbering ratio of main transport and ventilative laneways is 7.24%, which indicates preferable robustness of rock.

Key words: gold deposits, deposit exploitation, shaft-lane engineering, timbering and maintenance

CLC Number: 

  • TD856.13

[1] 王斯亮, 姚香. 河台金矿资源利用与探矿增储途径[J]. 黄金科学技术, 2001, 9(4): 44-51.
[2] 黄栋林. 河台金矿床地球化学研究[J]. 黄金科学技术, 2002, 10(3): 15-22.
[3] 采矿手册编委会. 采矿手册(2)[M]. 北京: 冶金工业出版社, 1990.
[4] 张合臻. 高村矿床后期断裂构造特征及对矿体的影响[J]. 广东地质, 2000, 15(2): 28-35.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!