RESEARCHON STABILITY OF THE ROOF AND BOTTOM PILLAR IN XINCHENG GOLD MINE

ZHAO Fujun1,2 ,LI Xibing2,ZHAO Guoyan2 ,LI Qiyue2,WANGJianbo3,ZHANG Fu3   

  1. 1. Xiangtan Polytechnic University, Hunan Xiangtan 411201, China;
    2. Central South University, Hunan Changsha 410083, China;
    3. Xincheng Gold Mine, Shandong Laizhou 261438, China
  • Received:2002-03-25 Revised:2002-04-16 Online:2002-12-28 Published:2012-05-30

Abstract:

According to the technological mining conditions of the roof and bottom pillar in Xincheng gold mine , the calculation formula of maximum deformation and horizontal critical load on artificial roof have been deduced by applying limit analytical method. The stability of the roof and bottom pillar has been monitored. During the test , the YZYof drilling hole st ress sensor with st rain and rigidity and the ast rictive meter have been used and tested separately the variation of st ress in the rock and the cooling strain in the drift road. A effective method has been t racked out for monitoring the stability of the analogical pillars.

Key words: artificial roof, stability, maximum deformation, ext reme load, monitoring

CLC Number: 

  • TD350


[1] W F Chen , T Atsuta. (周绥平,刘西译).梁柱分析与设计(第一卷):平面问题特性与设计
[M].北京:人民交通出版社,1997.

[2] 周楚良.矿山压力实测技术
[M].徐州:中国矿业大学出版社,1996.

[3] 蒋宇静,宋振骐.巷道顶底板岩层稳定性的极限分析法
[J].中国矿业大学学报,1988,1(1):16-21.

[4] 蔡美峰,乔兰,李长洪.新城金矿地应力场测量及其分布规律的研究
[J].有色金属,2000,21(3):1-6.