img

Wechat

Adv. Search

J4 ›› 2002, Vol. 10 ›› Issue (5): 43-46.

• article • Previous Articles    

RESEARCHON DRIVINGMETHODS FOR SHORT RALSE OF SMALL SECTION

SUN Xu ,ZHANG Hongwei   

  1. Lanzhou Engineering and Research Institute of Nonferrous Metallurgy ,Gansu Lanz hou 730000, China
  • Received:2002-05-27 Revised:2002-06-20 Online:2002-10-28 Published:2012-05-30

Abstract:

Based on analysis and improvement of some driving methods of raise shaft in medium-and-small mines , this paper int roduces two development methods suitable to raising in medium-and-small mines. Compared with convention methods and supporting methods ,the two int roduced methods have advantages of decreasing timber consumption ,reducing labor inrtensity ,shortening operation of cycle and lowering production cost .

Key words: raise, conventional methods, timber supporting, anchor bolting, scaffolding

CLC Number: 

  • TD854. 4


[1 ]  周达昌. 井巷工程
[M] . 北京:冶金工业出版社,1994.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!