Wechat
J4 ›› 2002, Vol. 10 ›› Issue (5): 43-46.
• article • Previous Articles
SUN Xu ,ZHANG Hongwei
Received:
Revised:
Online:
Published:
Abstract:
Based on analysis and improvement of some driving methods of raise shaft in medium-and-small mines , this paper int roduces two development methods suitable to raising in medium-and-small mines. Compared with convention methods and supporting methods ,the two int roduced methods have advantages of decreasing timber consumption ,reducing labor inrtensity ,shortening operation of cycle and lowering production cost .
Key words: raise, conventional methods, timber supporting, anchor bolting, scaffolding
CLC Number:
SUN Xu ,ZHANG Hongwei. RESEARCHON DRIVINGMETHODS FOR SHORT RALSE OF SMALL SECTION[J].J4, 2002, 10(5): 43-46.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2002/V10/I5/43
[1 ] 周达昌. 井巷工程[M] . 北京:冶金工业出版社,1994.
Cited